Laserfiche WebLink
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:This project will widen Warner Avenue between Main Street and Oak Street from 2 to 3 lanes in each direction. The project also includes additional left turn lanes at Main Street, bus turn outs, raised medians, and bike lanes along Warner Avenue between Main Street and Oak Street.PROJECT NEED:The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical Report identified the need for Warner Avenue to be widened to a six-lane major arterial to meet MPAH requirements. The existing Average Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The proposed improvements will allow the segment to accommodate future traffic volumes at a Level of Service A and increase operational efficiency.PROJECT TITLE:Warner Ave Improvements: Phase 1- Main to OakPROJECT CATEGORY:Street ImprovementsStreet/Bridge Improvements & WideningLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP EngineeringJason Gabriel, Principal Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction800,000------Right-Of-Way-------TOTAL800,000------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30DAF: DA-IV-------MEASURE M2 COMPETITIVE-------RMRA SB1800,000------TSIA AREA E-------TOTAL800,000------32