My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIPCAPITAL IMPROVEMENT PROJECT WORKSHEETPROJECT DESCRIPTION:This project will widen Warner Avenue between Oak Street and Grand Avenue from 2 to 3 lanes in each direction. The project will also include additional left turn lanes at Grand Avenue, bus pads, raised medians, and a protected bike lane.PROJECT NEED:The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical Report identified the need for Warner Avenue to be widened to a six-lane major arterial to meet MPAH requirements. The existing Average Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The proposed improvements will allow the segment to accommodate future traffic volumes at a Level of Service A and increase operational efficiency.PROJECT TITLE:Warner Ave Improvements: Phase 2- Oak to GrandPROJECT CATEGORY:Street ImprovementsStreet/Bridge Improvements & WideningLOCATION MAPAGENCY: DIVISION: CONTACT:Public Works CIP Engineering Jason Gabriel, Principal Civil EngineerPROJECT COSTSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30Construction5,151,910------Right-Of-Way1,410,130------TOTAL6,562,040------SOURCE OF FUNDSFY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30M2 LOCAL FAIRSHARE1,287,170------MEASURE M2 COMPETITIVE4,331,030------RMRA SB1500,000------TRANSP SYSTEM IMPRV AREA99,010------TSIA AREA E204,830------TSIA AREA F140,000------TOTAL6,562,040------33
The URL can be used to link to this page
Your browser does not support the video tag.