Laserfiche WebLink
8. NPDES SurchargeExisting Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee:Miscellaneous Fee Unit Fee NPDES Public Improvement Plan Check Each 26% of Plan Check Fee NPDES Building Permit Each 26% of Permit Fee NPDES Plumbing Permit Each 26% of Permit Fee NPDES Grading Permit Each 26% of Permit Fee NPDES Sewer Lateral Each 26% of Permit Fee NPDES Street Work Permit Each 26% of Permit Fee NPDES Sewer Each 26% of Permit Fee NPDES Water Each 26% of Permit Fee Memorialize the existing 26% NPDES surcharge on specific permits and plan checks for projects that have the potential to impact the City's storm drain system and/or stormwater runoff quality. These funds are used to fund the Federal Clean Water Protection Enterprise, which was created in 2002 via Ordinance No. NS-2519. The Federal Clean Water Protection Enterprise funds the operation and maintenance of the City's storm drain system and stormwater pollution reduction activities per the requirements of the North Orange County Municipal NPDES Permit. The 26% NPDES Surcharge on specific permits and plan checks was established in 2002 via Resolution No. 2002-100. 9. Outdoor Dining Restoration - Deposit (Refundable)Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee scheduleProposed Fee: $1,000.00Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, andmapping.10. Subdivision Survey Monument - Deposit (Refundable)Based on approved Engineer’s estimate Page 870 of 876