My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
06/06/2023 Regular & HA
>
Item 52 - Proposed Fiscal Year 2023-24 City Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 3:59:18 PM
Creation date
8/10/2023 3:54:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
52
Date
6/6/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: Actual Cost Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and mapping. 11. Work Performance & Payment - Deposit (Refundable)Based on approved Engineer’s estimate Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: Actual Cost Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and mapping. 12. Omnibus Concrete - Deposit (Non-Refundable)Based on approved Engineer’s estimate Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: Actual Cost Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and mapping. 13. Developer Contribution - Deposit (Non-Refundable)Based on approved Engineer’s estimate Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: Actual Cost Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and mapping. 14. Accelerated Improvement Plan Check Initial Deposit (Streets, Utilities, Maps, etc.)Page 871 of 876
The URL can be used to link to this page
Your browser does not support the video tag.