Laserfiche WebLink
Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: $576.00 Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, and mapping. 15. Improvement Plan Check Initial Deposit (Streets, Utilities, Grading, Maps, etc.)Existing Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee scheduleProposed Fee: $430.00Memorialize existing deposits for development projects, plan checks, street improvements, outdoor dining, andmapping.16. Junction ChamberExisting Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: $1,401.00 Memorialize existing street work fees for street and utility permits. 17. Soiling SampleExisting Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: $193.66 Memorialize existing street work fees for street and utility permits. 18. Miscellaneous Inspection FeesExisting Fee: Existing fees from SAPIN are already collected by the City, but are not listed on the fee schedule Proposed Fee: $196.66 Memorialize existing street work fees for street and utility permits. Page 872 of 876