Laserfiche WebLink
<br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2023-2024 FEE SCHEDULE <br />SECTION X <br />ADOPTED <br />FY 22-23 FEES <br />PROPOSED <br />FY 23-24 FEES <br />DEPARTMENT <br />CHANGESACCOUNTMISCELLANEOUS FEE UNIT <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />51602 <br />307) <br />308) <br />309) <br />310) <br />311) <br />312) <br />313) <br />314) <br />315) <br />316) <br />317) <br />318) <br />319) <br />Grease/Waste Interceptor 41.88 43.60 <br />37.50 <br />51.66 <br />51.66 <br />76.11 <br />76.11 <br />76.11 <br />35.36 <br />66.91 <br />76.11 <br />41.21 <br />51.66 <br />283.33 <br />Dental Unit 36.02 <br />49.63 <br />49.63 <br />73.11 <br />73.11 <br />73.11 <br />33.97 <br />64.27 <br />73.11 <br />39.59 <br />49.63 <br />272.17 <br />Medical Gas Piping (Fire Department) <br />Alteration to Drain or Vent Piping <br />Appliance not listed <br />Sewage Ejector <br />Sump Pump <br />Hot Water Storage Tank <br />Heat Exchanger <br />Cooling Tower <br />Booster Pumps <br />Fireline/Hydrant (Each 100 Feet) <br />Temporary Gas Meter, Prior to approval <br />Or Occupancy (30 Days) <br />Each Meter <br />At the time of application for temporary power, the owner <br />shall post a $1,000 cash or cashier's check conforming to the <br />Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br />Certificate of Completion or Certificate of Occupancy is issued. <br />Page 78 of 148