My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
05/16/2023 Special and Regular & Special HA
>
Item 27 - Water Supply Assessment for Cabrillo Town Center Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 4:32:44 PM
Creation date
8/10/2023 4:31:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
5/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana 2020 Urban Water Management Plan <br />arcadis.com <br />3-13 <br />Planning Area <br />Existing1 Buildout <br />Dwelling Units Building <br />(square feet)2 Dwelling Units Building <br />(square feet)2 <br />3.The figures shown on the row for the Adaptive Reuse Overlay represent parcels that are exclusively in the <br />Adaptive Reuse Overlay boundary. Figures for parcels that are within the boundaries of both the Adaptive <br />Reuse Overlay Zone and a specific plan, other special zoning, or focus area boundary are accounted for in the <br />respective specific plan, other special zoning, or focus area. <br />4.The City has included an assumption for growth on a small portion (5%) of residential parcels through the <br />construction of second units, which is distributed throughout the City and is not concentrated in a subset of <br />neighborhoods. Additional growth includes known projects in the pipeline and an increase of 10% in building <br />square footage and employment for the professional office surrounding the Orange County Global Medical Center <br />and along Broadway north of the Midtown Specific Plan as well as the commercial and retail along 1st Street south <br />of the West Santa Ana Boulevard focus area.
The URL can be used to link to this page
Your browser does not support the video tag.