My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:47:25 AM
Creation date
8/10/2023 4:54:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA <br />PROPOSAL ADDENDUM NO. ONE <br />PROJECT NO.: 20-6963 <br />KENNEDY ELEMENTARY AND VILLA FUNDAMENTAL INTERMEDIATE SRTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Diamond Construction & Design <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed work, that <br />they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and <br />do all the work required to complete the said work in accordance with said plans (if any) and the <br />specifications for the unit price(s) or lump sum(s) set forth in the following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />620 <br />CY <br />$ <br />$ <br />120 <br />$74,400 <br />2 <br />AC Pavement* <br />1,260 <br />TN <br />$ <br />$ <br />108.28 <br />$136,432.80 <br />3 <br />Cold Mill 2"* <br />62,000 <br />SF <br />$ 0.38 <br />$ <br />23,560.00 <br />4 <br />Rubberized Emulsion Aggregate Slurry <br />160 <br />TN <br />$ 400 <br />$ <br />(REAS), Type 11* <br />64,000 <br />5 <br />Crack Seal <br />1 <br />LS <br />$ 16450 <br />$ 16,450 <br />6 <br />PCC Sidewalk (T=4")* <br />10,100 <br />SF <br />$ 16 <br />$ <br />$161,600 <br />7 <br />PCC Driveway/Alley Approach (T = 8")* <br />860 <br />SF <br />$ 28 <br />$ $24,080 <br />8 <br />PCC Curb Ramp* <br />1,100 <br />SF <br />$ 35 <br />$ $38,500 <br />9 <br />PCC Curb and Gutter (Type A-2-8)* <br />1,800 <br />LF <br />$ 52 <br />$ <br />$93,600 <br />10 <br />PCC Curb (Type B-1)* <br />260 <br />LF <br />$ 40 <br />$ <br />10,400 <br />11 <br />PCC Cross -Gutter (T=9")* <br />2,700 <br />SF <br />$ 27 <br />$ 72,900 <br />12 <br />PCC Grinding* <br />500 <br />LF <br />$ 5 <br />$ 2,500 <br />13 <br />PCC Gutter Depression at Catch Basin, include <br />30 <br />LF <br />$ 24 <br />$720 <br />dowels spaced 18" <br />14 <br />Parkway Box Culvert <br />1 <br />EA <br />$ 14000 <br />$ <br />14,000 <br />15 <br />Truncated Dome <br />2 <br />EA <br />$ 1500 <br />$ <br />3,000 <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.