My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:47:25 AM
Creation date
8/10/2023 4:54:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA <br />PROPOSAL ADDENDUM NO. ONE <br />PROJECT NO.: 20-6963 <br />KENNEDY ELEMENTARY AND VILLA FUNDAMENTAL INTERMEDIATE SRTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />16 <br />Stamped Concrete* <br />1,400 <br />SF <br />$ 25 <br />$ 35,000 <br />17 <br />Aggregate Base * <br />45 <br />CY <br />$ 115 <br />$ <br />5,175 <br />18 <br />Root Shave* <br />40 <br />EA <br />$ 600 <br />$ <br />24,000 <br />19 <br />Remove Tree <br />1 <br />EA <br />$ 800 <br />$ 800 <br />20 <br />Furnish and Plant tree (Crape Myrtle, 24" box) <br />1 <br />EA <br />$ 1350 <br />$ 1350 <br />21 <br />Furnish and Install Water Valve Frame and <br />10 <br />EA <br />$ <br />$ <br />Cover to Finished Grade <br />750 <br />7,500 <br />22 <br />Adjust Manhole Frame and Cover to Finished <br />4 <br />EA <br />$ 1350 <br />$ 5,400 <br />' <br />Grade <br />23 <br />Signing and Striping <br />1 <br />LS <br />$ 116,245 <br />$ 116,245 <br />24 <br />Furnish and Install Speed Feedback Sign and <br />2 <br />EA <br />$ 33,680 <br />$ <br />Pole <br />67,360 <br />25 <br />Traffic Signal Modification at Grand Ave and <br />1 <br />LS <br />$181,457 <br />$ 181,457 <br />Chestnut Ave <br />26 <br />Install APS System at Grand Ave and Chestnut <br />1 <br />LS <br />$ <br />$ <br />Ave <br />19,595 <br />19,595 <br />27 <br />Install Video Detection System at Grand Ave <br />1 <br />LS <br />$ <br />$ <br />and Chestnut Ave <br />41 195 <br />41 195 <br />' <br />28 <br />Install 2" PVC Conduit per plan* <br />20 <br />LF <br />$ <br />$ <br />67 <br />1,340 <br />29 <br />Install 3" PVC Conduit per plan* <br />60 <br />LF <br />$ <br />$ <br />67 <br />4,020 <br />30 <br />Install 4" PVC Conduit per plan* <br />410 <br />LF <br />$ 67 <br />$27,470 <br />31 <br />Install No. 6 Pull Box <br />7 <br />EA <br />$ <br />$ <br />1200 <br />8,400 <br />32 <br />Install No. 6E Pull Box <br />2 <br />EA <br />$ 1200 <br />$ <br />2,400 <br />33 <br />Install Traffic Signal Loop Detector Type D <br />56 <br />EA <br />$ <br />$ <br />(Circular)* <br />350 <br />19,600 <br />34 <br />Install Traffic Signal Loop Detector Type E* <br />104 <br />EA <br />$ 325 <br />$ <br />33,800 <br />35 <br />Install Traffic Signal Loop Detector Type Q* <br />4 <br />EA <br />$ 350 <br />$ 1,400 <br />36 <br />Pothole Traffic Signal Pole Location for Utility <br />4 <br />EA <br />$ 2,100 <br />$ <br />Conflicts* <br />8,400 <br />37 <br />Temporary Overhead Wiring at Grand Ave and <br />1 <br />LS <br />$ 7,500 <br />$ <br />Chestnut Ave <br />7,500 <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.