My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/18/2023 Special and Regular
>
Item 13 - Kennedy Elementary and Villa Fundamental Intermediate Safe Route to School (SRTS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:47:25 AM
Creation date
8/10/2023 4:54:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
4/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA <br />PROPOSAL ADDENDUM NO. ONE <br />PROJECT NO.: 20-6963 <br />KENNEDY ELEMENTARY AND VILLA FUNDAMENTAL INTERMEDIATE SRTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />38 <br />Pothole for Utilities Not Shown on the Plans* <br />2 <br />EA <br />$ 1000 <br />$ 2,000 <br />39 <br />Project Advertisement Sign <br />2 <br />EA <br />$ 800 <br />$ 1,600 <br />40 <br />Construction Permit <br />1 <br />LS <br />$15,000 <br />$ 15,000 <br />TOTAL BASE BID (Items 1 to 40) <br />$ 1,374,149.80 <br />ADD ALTERNATE BID <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />41 <br />Install APS System at Chestnut Ave and Lyon <br />1 <br />EA <br />$ 17,500 <br />$ 17,500 <br />St <br />42 <br />Install Video Detection System at Chestnut Ave <br />1 <br />EA <br />$ 40,250 <br />$ <br />and Lyon St <br />40,250 <br />43 <br />Install GTT Opticom GPS EVP at Grand Ave <br />1 <br />EA <br />$ <br />$ <br />and Chestnut Ave <br />13,050 <br />13,050 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />j This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within one hundred (100,) working days after the commencement date stated in the Notice <br />to Proceed. Furthermore, all non -traffic signal related work, including but not limited to sidewalk, <br />curb and gutter, stamped concrete, coldmill, AC pavement, slurry seal, and signing and striping <br />shall be completed within the first 50 working days. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $2,500 per calendar. <br />Name of Firm Diamond Construction & Design <br />Signature of BIDDER <br />Title general partner <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.