Laserfiche WebLink
Local Assistance Procedures Manual EXHIBIT 10-1I2 <br />Cost Proposal <br />EXHIBIT 10.142 COST PROPOSAL <br />SPECIFIC RATE OF COMPENSATION (USE FOR ON -CALL OR AS -NEEDED CONTRACTS) <br />(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) <br />Consultant Kleinfelder, Inc. ❑K Prime Consultant ❑ Subconsultant 2nd Tier Subconsultant <br />Project No. RFQ 20-111 Contract No. TBD Participation Amount NTE 950,000.00 Date 1/27/2023 <br />FRINGE BENEFIT % <br />+ <br />GENERAL & ADMINISTRATIVE % <br />= COMBINED ICR% <br />57.05% <br />+ <br />101.97% <br />= <br />159.02% <br />Fee <br />= <br />10.00% <br />2.84922 <br />BILLING INFORMATION <br />CALCULATION INFORMATION <br />Name/Job Title/Classification <br />Hourly Billing Rates <br />Effective date <br />of hourly rate Actual or Avg <br />% or $ <br />Hourly Range - <br />Straight <br />OT(I.5x) <br />OT(2x) <br />From <br />To Hourly Rate <br />increase <br />for Classifications Only <br />GENERAL PREVAILING WAGE <br />CRAFT: BUILDING/CONSTRUCTION <br />SOILS AND MATERIAL <br />INSPECTOR AND FIELD <br />TESTERS <br />Hourly <br />Billing Rates <br />Effective date <br />of hourly rate <br />Engineering Technician (Field) <br />Straight <br />OT(I.5X) <br />OT(2x) <br />From <br />To <br />$ 173.86 $ 245.80 $ 317.74 <br />10/1/2022 <br />9/30/2023 <br />Group 1 - Field Soils and Material Testers <br />$ 179.08 <br />$ 253.17 <br />$ 327.27 <br />10/1/2023 <br />9/30/2024 <br />$ 184.45 <br />$ 260.77 <br />$ 337.09 <br />1 10/1/2024 <br />9/30/2025 <br />$ 178.93 $ 253.40 $ 327.88 <br />10/1/2022 <br />9/30/2023 <br />Group 2 - Special Inspection / Batch Plant <br />$ 184.30 <br />$ 261.00 <br />$ 337.72 <br />10/1/2023 <br />9/30/2024 <br />$ 189.83 <br />$ 268.83 <br />$ 347.85 <br />10/1/2024 <br />9/30/2025 <br />$ 184.63 $ 261.95 $ 339.28 <br />10/1/2022 <br />9/30/2023 <br />Group 3 - Nondestructive Testing <br />$ 190.17 <br />$ 269.81 <br />$ 349.46 <br />10/1/2023 <br />9/30/2024 <br />$ 195.87 <br />$ 277.90 <br />$ 359.94 <br />10/1/2024 <br />9/30/2025 <br />Hourly <br />Billing Rates <br />Effective date <br />of hourly rate <br />Engineering Technician (Field) -Special Shift <br />Straight <br />OT(I.5X) <br />OT(2x) <br />From <br />To <br />$ 175.28 $ 247.93 $ 320.59 <br />10/1/2022 <br />9/30/2023 <br />Group 1 - Field Soils and Material Testers (Special Shift) <br />$ 180.54 <br />$ 255.37 <br />$ 330.21 <br />10/1/2023 <br />9/30/2024 <br />$ 185.95 <br />$ 263.03 <br />$ 340.11 <br />10/1/2024 <br />9/30/2025 <br />$ 180.35 $ 255.54 $ 330.73 <br />10/1/2022 <br />9/30/2023 <br />Group 2 (Special Shift) <br />$ 185.76 <br />$ 263.21 <br />$ 340.65 <br />10/1/2023 <br />9/30/2024 <br />$ 191.33 <br />$ 271.10 <br />$ 350.87 <br />10/1/2024 <br />9/30/2025 <br />$ 186.05 $ 264.09 $ 342.13 <br />10/1/2022 <br />9/30/2023 <br />Group 3 (Special Shift) <br />$ 191.63 <br />$ 272.01 <br />$ 352.39 <br />10/1/2023 <br />9/30/2024 <br />$ 197.38 <br />$ 280.17 <br />$ 362.97 <br />10/1/2024 <br />9/30/2025 <br />NOTES: <br />*Subject to Prevailing Wage <br />- Billing rate = actual hourly rate * (1 + ICR) * (1 + Fee). <br />-Prevailing Wage DIR Detemtination: SC-23-63-2-2020-2D <br />- 3%annual escalation <br />Page 4 of 5 <br />