My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Amend Agreement for Construction Engineering Services: SR-55/Ritchey Street Water Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 17 - Amend Agreement for Construction Engineering Services: SR-55/Ritchey Street Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2023 5:11:59 PM
Creation date
8/10/2023 5:11:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
4/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 5 <br />February 8, 2023 <br />Mr. Gabriel Guerrero-Gabany, P.E. <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />RE: Construction Management Services for RFP 21-066 <br />Estimate for Additional Budget – Increase to Total Contract Amount <br />Dear Mr. Guerrero-Gabany, <br />Through Bi-Weekly Owner/CM meetings and the Monthly Report, the Construction Management (CM) <br />Team has kept the City informed as to the status of the CM budget and that additional budget for CM <br />services will be required to complete the work. At this time, it appears the existing funds will be expended <br />end of March 2023, based on the current usage rate. In general, the budget increase is due to 5 factors: <br />1) Additional admin work hours for various project issues, <br />2) Addition of CM scope for specialty inspections and scheduling included in Amendment 1, <br />3) Addition of CM scope for specialty inspections and scheduling to be included in Amendment 2, <br />4) Inspection OT/DT for Jack & Bore 72 hr/wk <br />5) Additional work periods of CM planned sched vs Contractor actual work sched. <br />The original budget was built upon the assumption of the continuation of the CM budget with 6 months <br />construction after March 2023 (2 months Ph-1 and 4 months Ph-2), as well as closeout (less than 1 month <br />fulltime). The Contractor’s current schedule update shows an increase in the schedule of 6 months in Phase <br />1 as compared to our original budgeted time (before construction bid). The time increase to the Contractor’s <br />schedule paired with the special issues/unbudgeted costs that have caused a budget overrun, are resulting <br />In an additional 12 months to be applied to the CM budget. As requested by City staff, we have prepared <br />an estimated cost for the CM Team to complete the project. Our analysis was performed using “to-date” <br />defined as through November 30, 2022. <br />CM PLANNED COSTS VERSUS ACTUAL COSTS: <br />The CM Team has experienced many significant special issues that have arisen on the project as well as <br />administrative setbacks on behalf of the Contractor that have required more hours from our staff than was <br />originally proposed. These special issues and administrative items are detailed below. As a result of these, <br />CM Costs have Exceeded Planned Cost to-date by $ 157,239.37, which is ~40% over the Planned-To-Date <br />for the Construction Period. When the savings from Pre-construction planned costs are applied, this <br />represents $ 151,559.72. <br />PM/RE and Contract Administrator Costs: During this period, the PM/RE position exceeded the original <br />planned estimate by ~95%, or ($128,328.30), the Contract Administrator position exceeded planned <br />estimate amount by ~10%, or ($10,984.96), the Inspector position was under the planned amount by ~4%, <br />$ 7,034.45, and the Utility Coordinator position was under the planned amount by ~13%, $ 3,523.00. <br />Note: The above differences between planned and actual costs include some of the costs that were <br />included in Amendment No. 1 such as CWA Rate difference and utilizing a Jr. Office Engineer to offset <br />Administrative time with a lower rate – the details of that Amendment are broken down below. <br />Overage Costs from Original Estimate Due to Project Special Issues To-Date: (128,328.30) <br />EXHIBIT 1
The URL can be used to link to this page
Your browser does not support the video tag.