My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />AUTOMATION <br />A TETRA TECH COMPANY <br />Dave Lewis, PE <br />• Rancho California Water District Water Pump Station Engine Controls Upgrade <br />Served as Project Engineer to upgrade natural gas engine control panels. The project involved <br />modifications to the existing Unity Pro PLC program to convert from serial Modbus <br />communications to Ethernet based Modbus TCP/IP to gather emissions data for air quality <br />compliance. Responsibilities included PLC programming, network design. Worked in coordination <br />with engine controls contractor to perform onsite implementation and startup processes. <br />• J.R. Simplot Nitric Acid Plant Controls Rehabilitation <br />Project Engineer on contracts valued at $1.5 million to upgrade the controls system at J.R. <br />Simplot's nitric acid plant in California. The upgrades required significant reverse engineering and <br />rehabilitation of the 1/0 and PLC systems comprising of approximately 350 1/0 points and 14 <br />legacy distributed RTUs. Performed design and commissioning efforts to provide 1 new master <br />PLC panel and 4 remote 1/0 panels based on Allen Bradley Controllogix 5000, Flex 1/0 and <br />ControlNet. Developed ControlLogix 5000 PLC code and associated CitectSCADA revisions as <br />legacy PLCs were decommissioned. Responsibilities include SCADA and PLC programming, <br />network design, control panel design, management of client's electricians, quality control <br />procedures, startup and training. <br />Employment History <br />• Enterprise Automation, Irvine, CA, Senior Engineer Sep. 2008 — Present <br />• Bekum America Corp., Williamston, MI, Controls Engineer Oct. 1993 — Aug. 2008 <br />ENTERPRISE AUTOMATION • 210 GODDARD • IRVINE, CA • 92618 <br />PHONE (949) 769-6000 • WWW.EAINTEGRATOR.COM <br />City of Santa Ana I On -Call Engineering Design Services for PFAS Treatment Systems RFP NO. 22-133 A-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.