My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
04/04/2023 Special and Regular & HA
>
Item 19 - Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:43:44 AM
Creation date
8/10/2023 5:12:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
19
Date
4/4/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY CP SANTA ANA <br />RFP NO,: 22-133 <br />ON -CALL ENGINEERING DESIGN SERVICES FOR PEAS TREATMENT SYSTEMS <br />f, Final section views <br />g. Final plans of mechanical roams <br />h, Final control diagrams including control point list and final sequence of <br />operation <br />i. Final. building components "U" value calculations <br />j. Final mechanical details <br />k. Final energy code calculations <br />ill. Electrical System <br />a, Lighting and receptacles circuited <br />b, Special electrical equipment circuited. <br />c. FlnaI panel schedules -- showing `balanced. loads <br />0 Final arc flash analysis <br />e. Final electrical Wore!s.0hodule <br />f. Ccrriplete ogle-l.l.6e diagraft which are dlroctly applicable to the, panel <br />sch.odule <br />g. F'inal e.loctricai details <br />h, Final eloctr cal load oAlculations ,lhc.ludfhg :ei-nergency generator syatem <br />VIL Instwtnehtat.1on an.d Ciontrol S.ystem <br />a. Final control schematics <br />.b, Final security and access control plans. <br />c. Final location of alarm devices determined <br />d. Final.PLCIUCS wiring dlagmr- <br />e. AC/DC power d4,9tribution wiring diagrams <br />3.111111) PHASE <br />Upon cornpi.etion and approval of the I00%.t�oslgh phase. the C.Ityshall requost.the Consultant <br />to:assist with the bidding phase.. <br />A. ,PROJECT iVIANAGEM ENT <br />The Consultant shall coordinate and oxpedite the preparation, assembly and delivery of bid <br />documents for the City to administer via Planetl3 s Portal. The Consultant shall take the <br />necessary procedures to administer arty prequalifrcatloo of potential Construction <br />Contractors as directed by the City to ensure that all Contracts are competitively bId.. <br />R. TECHNICAL SUPPORT <br />The Consultant shall provide technical support to the City on questions regarding the <br />meaning and intent of the drawings and specifications., and shall .assist in achieving the <br />resolution in clarifying any comments potential. CQnstruction Contractors may have during <br />the Kidding phase, <br />City of Santa Ana PFP 22-133 _.._ <br />On -Call C-ngineering. Design Services for PFAS Treatment Systems <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.