Laserfiche WebLink
CITY OF SANTA ANA <br />RFP NO.: 22-133 <br />ON -CALL. ENGINEERING DESIGN SERVICES FOR PEAS TREATMENT SYSTEMS <br />make recornmendations to the City when work is ready far final inspection. Upon request, <br />the Consultant .shall assist the City in conducting final inspections. <br />D. CODE. CC}MPL.IANCE. <br />All materials and workmanshIp shall be in strict conformity with federal, state and local codes, <br />requirements, standards of the latest editions, and guidelines including. revisions of the following: <br />Califorr7ia. Ouilding Code (CBC) <br />Arngrican National Standards .I.nstitute, (ANSI) <br />American Society of Testing. and Materials (AST lVl.) <br />Department of Transportation (DOT) <br />California State Water Resources Contra€ Board <br />+ Department. of Dri'dking Water <br />o South Coast Air Qua€ity Management District (SCAQMD) <br />Environmental Protection Agency (EPA) . <br />* Occupational Safdtyand Health Administration(OSHA) <br />E. PROJECT MANAGEMENTAND COORDINA O ' <br />When e.:request fear service 'is ]s 'ued to the City, the Consultant shall Issue an;ostimate: to thE) <br />City's designated Project Manager. The Consultant shall not proceed with Any-wark without the <br />approval of tho City''s designated :Pilect Manager in the form of a Notice to -Proceed. <br />C0nsuftants shall €nvo ce the City on a monthly basis for all Work. peifarmed.during the p.edod a <br />jaroVide ai one-time invaic the damp€etion of vyrarlt issued' Each invoice shot! l9 accompanied <br />.by.a. summary of tasks performed; contract agreement number, results and pragress :on long- <br />F. <br />The Consultant may propose additional related services thiat the. City, has not specifically <br />identified in this RFP to accomplish the .:stated goals :of this RFP. Value added related <br />services will be considered by the City and may or may :not be Incorps rated. in the agreement, <br />All parts anal mMer€als rnust be supplied new and factory approved,. <br />G; MARKUP <br />The following markup percentages shall. be added to .the 0otisultant's s costs and shall <br />constitute the markup for all overhead and profits (to the sum of the costs and markups, one <br />(1) percent shalt be added as compensation for bonding): <br />1) Labor- ___ ................................. ............ ....... ............ _.,.............. ., 20 <br />2) Mate,Lials.... ................ .......... ........................... ..................... ...........15 <br />3) Equipment Rental............ ...... . , .., ................... 15 <br />City of Santa Ana RFP 22.1$3 <br />OnwCall Engineering Design Services for PFAS Treatment Systems <br />Page 21 <br />