My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/21/2023 Special and Regular
>
Item 15 - Downtown Flood Reduction and Stormwater Infiltration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 10:27:22 AM
Creation date
8/11/2023 8:38:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
15
Date
3/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Agency <br />www.santa-ana.org/public-works <br />Item # 15 <br />City of Santa Ana <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Staff Report <br />March 21, 2023 <br />TOPIC: Downtown Flood Reduction and Stormwater Infiltration Project <br />AGENDA TITLE <br />Approve Appropriation Adjustments and Award a Construction Contract to GMZ <br />Engineering, Inc. in the Amount of $4,642,644 for the Downtown Flood Reduction and <br />Stormwater Infiltration Project with an Estimated Construction Delivery Cost of <br />$5,640,000 (Non -General Fund) <br />RECOMMENDED ACTION <br />1. Approve an appropriation adjustment to recognize an additional $1.25 million in <br />Proposition 68 Urban Flood Protection (UFP) grant funding from the California <br />Natural Resources Agency into the Public Works Agency Enterprise Capital <br />Grants, Direct Revenue Account and appropriate the same amount into the <br />California Natural Resources Agency Urban Flood Protection, Improvements <br />Other Than Building expenditure account. (Requires five affirmative votes) <br />2. Approve an appropriation adjustment to recognize $900,000 of prior year fund <br />balance in the Federal Clean Water Protection fund, Prior Year Carryforward <br />revenue account and appropriate the same amount into the Federal Clean Water <br />Protection Enterprise, Improvements Other Than Building expenditure account. <br />(Requires five affirmative votes) <br />3. Approve an amendment to the Fiscal Year 2022-23 Capital Improvement <br />Program to add $1.25 million of Proposition 68 Urban Flood Protection Grant <br />Program funding and $900,000 of Federal Clean Water Protection Enterprise <br />funding for the Downtown Flood Reduction and Stormwater Infiltration Project <br />(22-6622). <br />4. Award a construction contract to GMZ Engineering Inc., the lowest responsible <br />bidder, in accordance with the base bid plus bid alternate in the amount of <br />$4,642,644, for construction of the Downtown Flood Reduction and Stormwater <br />Infiltration Project, for the term beginning March 21, 2023 and ending upon <br />project completion, and authorize the City Manager to execute the contract <br />subject to non -substantive changes approved by the City Manager and the City <br />Attorney. <br />
The URL can be used to link to this page
Your browser does not support the video tag.