Laserfiche WebLink
Downtown Flood Reduction and Stormwater Infiltration Project <br />March 21, 2023 <br />Page 2 <br />5. Approve the Project Cost Analysis for a total estimated construction delivery cost <br />of $5,640,000, which includes $4,642,644 for the construction contract, $552,356 <br />for contract administration, inspection and testing, and a $445,000 project <br />contingency for unanticipated or unforeseen work. <br />DISCUSSION <br />This Downtown Flood Reduction and Stormwater Infiltration Project features the <br />upgrade of storm drain infrastructure along East 3rd Street, between Main Street and <br />French Street, and the construction of a subsurface stormwater infiltration system <br />underneath the City -owned parking lot at 3rd Street and Bush Street (Exhibit 1). The <br />project also includes drought -tolerant landscaping, reconstruction of the City -owned <br />parking lot, paving, and interpretive signage to promote stormwater management. This <br />project will help reduce flooding Downtown, increase local water supplies, and improve <br />water quality in the Newport Bay watershed. <br />Public Outreach and Contractor Participation <br />This project was originally advertised for bid on November 8, 2022, with bids due on <br />December 6, 2022. To provide an opportunity for local vendors to submit bids, the City <br />notified 1,494 regional vendors via PlanetBids, many of which are Santa Ana based. Six <br />vendors requested bidding documents, and a total of six bids were received. Bids were <br />not received from any Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on November 14, 2022 and November 23, 2022. The project was also <br />advertised in PlanetBids from November 8, 2022 through December 6, 2022. Bids were <br />received electronically via PlanetBids on December 6, 2022. <br />Bid Results Summary <br />Rank <br />Bidder's Name <br />Location <br />Base Bid <br />1 <br />GMZ Engineering, Inc. <br />Westlake Village, CA <br />$4,458,844 <br />2 <br />Big Ben Inc. <br />Irvine, CA <br />$4,763,888 <br />3 <br />Boudreau Pipeline Corporation <br />Corona, CA <br />$5,039,548 <br />4 <br />Excel Paving Co <br />Long Beach, CA <br />$5,179,765 <br />5 <br />mmc, inc <br />La Palma, CA <br />$5,594,943 <br />6 <br />Access Pacific, Inc. <br />Pasadena, CA <br />$6,180,861.78 <br />A total of six bids were received, all of which were deemed responsive. GMZ <br />Engineering, Inc. submitted the lowest responsive base bid in the amount of $4,642,644 <br />