Laserfiche WebLink
EXHIBIT A <br />CITY OF ,S TA ANA <br />PROPOSAL <br />PROJECT NO.: 22-662-1 <br />DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTRATION <br />DID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: GMZ Engineering, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that Lhey have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and lierehy proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lurnp sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qt} <br />Unit <br />Unit Price <br />Amount <br />I <br />Remove Ballard <br />5 <br />EA <br />$ 250.00 <br />$ 1,250.00 <br />2 <br />Remove, Salvage/Replace. and Reinstall <br />54 <br />EA <br />$ iD0.00 <br />$ 5,400.00 <br />Wheel Stop <br />3 <br />Remove, Salvage, and Reinstall Parking <br />26 <br />EA <br />$ 100.00 <br />$ 2'000'00 <br />Meter Post <br />4 <br />Remove, Salvage, and Reinstall Swing <br />1 <br />EA <br />$ <br />$ <br />Gate <br />?,500.00 <br />2,500,DO <br />5 <br />I Remove, Salvage, and Reinstall Waste <br />1 <br />EA <br />S 250.00 <br />$ 250.00 <br />Receptacle <br />G <br />j Remove, Salvage/Rcpiace, and Reinstall <br />4 <br />EA <br />� S <br />1,500.00 <br />$ 5 p04.00 <br />Elrcaic Pullbox <br />7 <br />Remove. Salvage, and ItclastaII LighL Pole <br />2 <br />CA <br />S <br />S <br />10,000.00 <br />20,000.00 <br />8 <br />Remove. Salvage, and Reinstall Electric <br />1 <br />EA <br />S <br />S <br />Vehicle Chareina Station <br />10,000.00 <br />10,000.00 <br />9 <br />Remove, Salvage, and Reinstall <br />1 <br />Eel <br />$ <br />S <br />Emergency Phone Pole <br />10,000.0010,000.00 <br />10 <br />Remove and Replacc Electrical Conduit <br />1 <br />L5 <br />$ <br />25,000.00 <br />S <br />25,000.00 <br />and Wiring In Kind <br />t ] <br />Remove Storm Drain Maintenance Hole <br />3 <br />E,A <br />S 5.000,00 <br />S 15,000.00 <br />12 <br />Clearing and Grubbing <br />1,730 <br />SF <br />S <br />5.00 <br />S <br />8,9001)0 <br />13 <br />Remove Tree <br />2 <br />EA <br />S 1,500.00 <br />i $ 3,000.00 <br />14 <br />Unclassilied Exc a e, ation and Export <br />7,59U <br />Cy <br />S 85.00 <br />$ 220,150,00 <br />fiParkiil� Lot]* <br />15 <br />Unclassified Excavation. Stockpile, land <br />4,566 <br />Cy <br />$ 25.00 <br />S 112,500.00 <br />Reuse as Backfill (Parking Lot)* <br />P-1 ofP-l9 <br />