Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6622 <br />DOWNTOWN FLOOD REDUCT[ON AND STORMWATI R INFILTRATION <br />Item <br />Description <br />Qty <br />Chit <br />Unit Price <br />Amount <br />15 <br />Install Shoring for Underground Storage <br />7,865 <br />5F <br />5 <br />Reservoir* <br />uO.OD <br />3'93,250.00 <br />17 <br />Install 8" 5DR35 PVC Pipe Inc[. <br />151 <br />LF <br />$ <br />5 <br />Trenching, Renick,als, Bedding, and <br />355.00 <br />65,115.00 <br />Backfill <br />18 <br />Instal 18" DIP [CL250] Incl. Trenching, <br />47 <br />LF <br />S <br />$ <br />Removals, Bedding, Backfill, and <br />535.00 <br />26,145.00 <br />Pavement Re luuemcnt <br />19 <br />Install 18" RCP (2500-D) Incl. Trenching, <br />367 <br />LF <br />S <br />S <br />Removals, Bedding, Backfill, and <br />460.00 <br />168,820.00 <br />Pavement Replacement <br />20 <br />Install 21" RCP (2000-13) Inal, Trenching, <br />10 <br />LF <br />S <br />S <br />Removals, Bedding, Back -fill, and <br />490.00 <br />4,900.00 <br />Pavement Replacement <br />21 <br />Install 24" RCP (2000-D) Incl, Trenching. <br />102 <br />LF <br />S <br />S <br />Removals, Bedding, Backfill, and <br />520.00 <br />5.3,040.00 <br />Pavement Rc lacement <br />22 <br />Install 30" RCP (2000-D) Tncl. Trenching, <br />310 <br />LF <br />$ <br />$ <br />Removals, Bedding, Backfill, and <br />590.00 <br />182,900 00 <br />Pavement R❑ lacement <br />23 <br />Install 3G" RCP (2000-D) Incl. Trenching, <br />295 <br />LF <br />$ <br />$ <br />Removals, Bedding, Backfill, and <br />675.0C <br />'199,125,00 <br />Pavement Replacement <br />24 <br />Install 39" RCP (2000-D)1ncl. Trenching, <br />10 <br />LF <br />$ <br />$ <br />Removals, Bedding, BackGll, and <br />540,00 <br />5,400,t70 <br />Pavement Replacement <br />25 <br />Construct Concrete Collar <br />8 <br />EA <br />$ <br />3.afa0.ao <br />$ <br />24.000.I)0 <br />26 <br />Construct Junction Structure Per SPPWC <br />l <br />EA <br />$ <br />$ <br />Std. Plan 331-3 <br />5,000•00 <br />5,000.00 <br />27 <br />Construct Type A Junction Chamber IncL <br />5 <br />EA <br />S <br />$ <br />Excavation, Removals, Backfill, and <br />22 50C C0 <br />112.500.00 <br />Pavement Replacement <br />28 <br />Construct Type B Junction Chamber Incl. <br />I <br />EA <br />$ <br />S <br />Excavation, Removals, Backfill, and <br />25,000_00 <br />25,000.00 <br />Pavement Replacement <br />29 <br />Construct Low Flow Diversion Vault Inc]. <br />1 <br />EA <br />S <br />S <br />Excavation. Removals, Backfill. and <br />21,500.90 <br />21 500.00 <br />Pavement Replacement <br />30 <br />Construct Low Flow Diversion iv1H Incl. <br />1 <br />EA <br />$ <br />S <br />Excavation. Removals. Backfill, and <br />� <br />22, 500.00 <br />22, 500.00 <br />Pavement Replacement <br />31 <br />Install 15"X 18" Grated Catch Basin n ith <br />2 <br />EA <br />S <br />S <br />Catch Basin Filler Insert (DEdcastle <br />500 00 <br />15 000.00 <br />FloGard or approved equal) Incl, <br />Excavatian. Removals, and Backfill <br />32 <br />Install 18"x18" Grated Catch Basin :fir <br />? <br />EA <br />S <br />S <br />Vent with Catch Basin Filter Insert <br />(dldcastle FloGard or approved equal) <br />�.500.00 <br />15,000.00 <br />Incl. Incl. Excavation, Removals, and <br />Backfill <br />P-2 o l' P-19 <br />