Laserfiche WebLink
CITY OF SANTA ANA <br />PRO Pa SAL <br />PROJECT NO.: 22-5422 <br />DOWNTOWN FLOOD REDUCTION! AND STORMWATER INFILTRATIONI <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: GMZ Enaineerinci. Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove Bollard <br />5 <br />EA <br />$ 250.00 <br />$ 1,250.00 <br />2 <br />Remove, Salvage/Replace, and Reinstall <br />54 <br />EA <br />$ 100.00 <br />$ 5,400.00 <br />Wheel Stop <br />3 <br />Remove, Salvage, and Reinstall Parking <br />26 <br />EA <br />$ 100.00 <br />$ 2.600-00 <br />Meter Post <br />4 <br />Remove, Salvage, and Reinstall Swing <br />I <br />EA <br />$ <br />$ <br />Gate <br />2,500.00 <br />2,500.00 <br />5 <br />Remove, Salvage, and Reinstall Waste <br />I <br />EA <br />S 250.00 <br />$ 250.00 <br />Receptacle <br />6 <br />Remove, Salvage/Replace, and Reinstall <br />4 <br />EA <br />$ <br />1,500.00 <br />$ <br />13,000.00 <br />Electric Pullbox <br />7 <br />Remove, Salvage, and Reinstall Light Pole <br />2 <br />EA <br />$ <br />$ <br />10,000.00 <br />20,000.00 <br />8 <br />Remove, Salvage, and Reinstall Electric <br />1 <br />EA <br />$ <br />S <br />Vehicle Charging Station <br />10,000.00 <br />10,000.00 <br />9 <br />Remove, Salvage, and Reinstall <br />I <br />EA <br />$ <br />S <br />Emergency Phone Pole <br />10,000.00 <br />10 000.00 <br />10 <br />Remove and Replace Electrical Conduit <br />I <br />LS <br />$ <br />$ <br />25,000.00 <br />and Wiring In Kind <br />25,000-00 <br />11 <br />Remove Storm Drain Maintenance Hole <br />3 <br />EA <br />$ <br />5,000.00 <br />$ <br />15,000.00 <br />12 <br />Clearing and Grubbing <br />1,780 <br />Si' <br />S <br />5.00 <br />$ <br />$,900.00 <br />I3 <br />Remove Tree <br />2 <br />EA <br />$ 1,500,00 <br />S 3,000.00 <br />14 <br />Unclassified Excavation and Export <br />2,590 <br />CY <br />$ 85.00 <br />$ <br />220,150.0D <br />(Parking Lot)* <br />IS 1Unclassified <br />Excavation, Stockpile, and <br />4,500 <br />CY <br />$ 25,00 <br />$ 112,500.00 <br />Reuse as Backfill (Parking Lot)* <br />P-1 ofP-19 <br />