Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6622 <br />DOWNTOWN FLOOD REDUCTION AND STORMWATER INFILTR-ATION <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />16 <br />Install Shoring for Underground Storage <br />7,865 <br />SF <br />$ <br />$ <br />Reservoir* <br />50 00 <br />393,250 00 <br />17 <br />Install 8" 5DR35 PVC Pipe Incl. <br />151 <br />LF <br />$ <br />$ <br />Trenching, Removals, Bedding, and <br />355.00 <br />55,115.00 <br />Backfill <br />18 <br />Install 18" DIP (CL.250) Incl. Trenching, <br />47 <br />LF <br />$ <br />S <br />Removals, Bedding, [Backfill, and <br />535.00 <br />25,145.00 <br />Pavement Re lacement <br />19 <br />Install 18" RCP (2500-D) Incl. Trenching, <br />367 <br />LF <br />$ <br />S <br />Removals, Bedding, Backfill, and <br />450.00 <br />1 G8 820 00 <br />Pavement Replacement <br />20 <br />Install 21" RCP (2000-D) Incl. Trenching, <br />IO <br />LF <br />$ <br />S <br />Removals, Bedding, Backfill, and <br />490.00 <br />4,900.00 <br />Pavement Re lacement <br />21 <br />Install 24" RCP (2000-D) Incl. Trenching, <br />102 <br />LF <br />$ <br />S <br />Removals, Bedding, Backfill, and <br />520,00 <br />53,040.00 <br />Pavement Replacement <br />22 <br />Install 30" RCP (2000-D) Incl. Trenching, <br />310 <br />LF <br />$ <br />$ <br />Removals, Bedding, Back Fill, and <br />590.00 <br />1$2,900.00 <br />Pavement Replacement <br />23 <br />Install 36" RCP (2000-D) Incl. Trenching, <br />295 <br />LF <br />$ <br />$ <br />Removals, Bedding, Backfill, and <br />675.00 <br />199,125,00 <br />Pavement Replacement <br />24 <br />Install 39" RCP (2000-D) Incl. Trenching, <br />10 <br />LF <br />$ <br />$ <br />Removals, Bedding, Backfill, and. <br />540.00 <br />5,400.00 <br />Pavement Replacement <br />25 <br />Construct Concrete Collar <br />8 <br />EA <br />$ <br />3,000.00 <br />$ <br />24,000_00 <br />26 <br />Construct Junction Structure Per SPPWC <br />t <br />EA <br />$ <br />$ <br />Sid. Plan 331-3 <br />5.000.00 <br />5,000.00 <br />27 <br />Construct Type A Junction Chamber Incl. <br />5 <br />EA <br />$ <br />$ <br />Excavation, Removals, Backfill, and <br />22 500 00 <br />112,500.00 <br />Pavement Replacement <br />28 <br />Construct Type B Junction Chamber Incl. <br />I <br />EA <br />$ <br />$ <br />Excavation, Removals, Backfill, and <br />25.000.00 <br />25,000.00 <br />Pavement Replacement <br />29 <br />Construct Low Flow Diversion Vault Incl. <br />1 <br />EA <br />$ <br />S <br />Excavation, Removals, Backfill, and <br />21,500.00 <br />21,500.00 <br />Pavement Replacement <br />30 <br />Construct Low Flow Diversion lvll-1 Incl. <br />I <br />EA <br />$ <br />S <br />Excavation, Removals, Backfill, and <br />22,500.00 <br />22.500.00 <br />Pavement Replacement <br />31 <br />Install 18"X 13" Grated Catch Basin with <br />2 <br />EA <br />S <br />S <br />Catch Basin Filter Insert (Qldcastle <br />7,500.00 <br />15,000.00 <br />FloGard or approved equal) Incl. <br />Excavation, Removals, and Backfill <br />32 <br />Install 18"xl8" Grated Catch Basin Air <br />2 <br />EA <br />$ <br />S <br />Vent with Catch Basin Filter Insert <br />7,500.00 <br />15,000.00 <br />(01dcastle F1oGard or approved equal) <br />Incl. Incl. Excavation, Removals, and <br />Backfill <br />P-2 of P- 19 <br />