PROPOSAL FOR
<br />On -Call Environmental Services
<br />RFP NO.: 21-105
<br />• First Street Stabilization Project CATEX, Santa Ana, CA
<br />• Moulton Niguel Water District Crown Valley Pipeline Replacements Project, Laguna Niguel, CA
<br />• Central Park Amphitheater Project IS/MND, Rancho Cucamonga, CA
<br />• Central Park Program EIR, Rancho Cucamonga, CA
<br />na River Interceptor Line Project, Supplemental EA and EIR Addendum, Orange County, CA
<br />WW
<br />LICENSES, REGISTRATIONS, &
<br />CERTIFICATES:
<br />EDUCATIONAL BACKGROUND:
<br />BS, Environmental Engineering,
<br />POSITION WITH TETRA TECH:
<br />Project Manager
<br />Registered California PE
<br />No.C70879 No. 74974 (2009)
<br />California Polytechnic State
<br />University, San Luis Obispo
<br />PROJECT ROLE:
<br />Preliminary Engineering
<br />Qualified Stormwater Pollution
<br />Prevention Plans (SWPPP)
<br />Developer (QSD), Certificate
<br />No. 74974
<br />EXPERIENCE:
<br />Mr. Schreiner is a civil engineering project manager at Tetra Tech's office in Irvine, California. He manages
<br />domestic projects on behalf of government clients, applying a successful 15-year history of project
<br />management, hydrologic and hydraulic modeling, civil engineering design, condition assessments of a variety
<br />of infrastructure, and cost estimating. He most recently served as project manager for numerous on -call
<br />contracts with various public agencies in the Southern California area including Orange County Public Works,
<br />L.A. Metro, City of L.A., John Wayne Airport, Riverside County Transportation Commission, and Los Angeles
<br />County Department of Public Works. As a QSD, Mr. Schreiner has ample experience with providing SWPPP
<br />for construction activities.
<br />REPRESENTATIVE PROJECT EXPERIENCE:
<br />• First Street Stabilization Project, Santa Ana, CA
<br />• First Street Pedestrian Improvements, Santa Ana, CA
<br />• Lincoln Avenue Pedestrian Pathway, Santa Ana, CA
<br />• Complete Streets Projects (TOS-1), Los Angeles, CA
<br />• Vermont Avenue Stormwater Capture and Green Street Project Phase 2, Los Angeles, CA
<br />• Silver Lake Reservoir Stormwater Capture Project, Los Angeles, CA
<br />• Caruthers Park Stormwater and Urban Runoff Capture Project, Bellflower, CA
<br />UltraSystems
<br />The UltraSystems project team has experienced senior staff (many with more than 30 years of technical
<br />expertise). All key personnel have proven experience managing projects within Orange County.
<br />UltraSystems project team key task leads are noted below.
<br />Ms. Lindsay oversees the quality assurance program, and all matters relating to the contract, and contract
<br />execution. Ms. Lindsay has over 35 years of experience, has successfully prepared over 400
<br />environmental documents for a broad spectrum of projects, and has managed over 20 large-scale, on-
<br />call/as-needed contracts that have encompassed thousands of task orders relating to public agency
<br />projects. Ms. Lindsay is able to communicate with clients, facilitate teams, manage personnel including
<br />resource allocation, work collaboratively with agencies, run meetings for clients, provide strategic thinking,
<br />and most importantly, get projects built for clients.
<br />EDUCATION
<br />❖ M.S., Urban and Regional Planning, California State Polytechnic University, Pomona, CA
<br />❖ B.S., Geography, California State University, Long Beach, CA
<br />RELEVANT EXPERIENCE
<br />• County of Orange, OC Loop Segments O, P, Q — IS/MND and CE
<br />• South Gate, Garfield Improvements — PES
<br />• City of Bell, Gage Avenue Bridge over the Los Angeles River— IS/MND
<br />City of Santa Ana 6 TETRA TECH
<br />
|