10
<br />PROPOSAL FOR
<br />On -Call Environmental Services
<br />RFP NO.: 21-105
<br />• City of Fontana, Foothill Widening Malage Bridge — IS/MND, PES
<br />• Kings County, KART Transit Project, Hanford, CA - IS/MND and EA/FONSI
<br />City of Commerce, Transit Maintenance Facility — IS/MND and CE
<br />PROFESSIONAL REGISTRATIONS, LICENSES AND AFFILIATIONS
<br />Institute of Sustainable Infrastructure, Envision Sustainability Professional
<br />Dr. Michael Rogozen has over 45 years of environmental consulting experience in California, and manages
<br />the UltraSystems' Air, Noise, and Greenhouse Gas Group. His experience includes permitting, ambient
<br />monitoring, dispersion modeling, health risk assessment, design of pollution control technology, evaluation
<br />of air pollution control alternatives, development of air toxics emission inventories, calculation of GHG
<br />emissions, offsite consequence analysis, design of environmental databases, survey design, source test
<br />design and analysis, subsurface methane investigations, and regulatory analysis. Dr. Rogozen has the
<br />experience to critically evaluate the work of experts in a variety of technical disciplines and has developed
<br />a comprehensive quality assurance/quality control Program for UltraSystems environmental documents.
<br />He has prepared Caltrans documentation for numerous projects, including PESs, air quality reports,
<br />project -level conformity analyses, POAQC determinations, and initial site assessments. He has also
<br />managed several projects that have included historic property survey reports and archeological survey
<br />reports by UltraSystems staff.
<br />EDUCATION
<br />❖ D.Env. Environmental Science and Engineering, University of California, Los Angeles, CA
<br />❖ M.S., Systems Engineering, University of California, Los Angeles, CA
<br />❖ B.S., Engineering, University of California, Los Angeles, CA
<br />RELEVANT EXPERIENCE
<br />• County of Orange, OC Loop Segments O, P, Q — IS/MND and CE
<br />• Environmental Compliance for OC Streetcar Construction, Santa Ana, CA
<br />• Preliminary Environmental Study, Imperial Highway Traffic Signal Upgrades and Safety
<br />Enhancements Project, Downey, CA
<br />• Dogwood Road Bridge Replacement Over Central Main Canal, Imperial County, CA
<br />• Preliminary Environmental Study and Technical Studies Crosswalk Upgrades Project, Moreno
<br />Valley, CA
<br />• PES, Air Quality, Initial Site Assessment and Cultural Studies, Inglewood Avenue Corridor
<br />Widening Project, Lawndale, CA
<br />Section D Understanding of Need
<br />Tetra Tech understands the City's goals to efficiently and effectively build and maintain all public streets,
<br />storm drains, sewers, and water facilities in the City while protecting environmental resources. Tetra Tech
<br />is very familiar with the City's current and planned public works projects including First Street
<br />Improvements Project, Lincoln Avenue Pedestrian Pathway Project, Well 32 and Pipeline Project, and the
<br />Washington Well Project.
<br />Tetra Tech is committed to providing the City of Santa Ana a team that can demonstrate strong
<br />performance in environmental services to meet all the demands of the anticipated projects and ultimately to
<br />deliver a successful project.
<br />Environmental stewardship must be a key component in the design and implementation of public works
<br />projects. The CEQA and NEPA processes and requirements vary significantly from project to project
<br />presenting unique challenges in ensuring compliance with all environmental regulations. Additionally, the
<br />public comment periods can impact the processes thus lengthening schedules and increasing costs. Our
<br />City of Santa Ana 7 TETRA TECH
<br />
|