My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:58:53 AM
Creation date
8/11/2023 9:27:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
10
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/18122, 8:40 AM SAM.gov EXHIBIT "B" <br />The cleaning, rodding and installation of ""fish and pull REBID <br />wires"". The excavation, setting, leveling and grouting of <br />precast manholes, vaults, and pull boxes including ground <br />rods or grounding systems, rock necessary for leveling and <br />drainagae as well as pouring of a concrete envelope if <br />needed. <br />JOURNEYMAN TRANSPORTATION ELECTRICIAN shall perform all tasks <br />necessary toinstall the complete transportation system. <br />JOURNEYMAN TECHNICIAN duties shall consist of: Distribution <br />of material at job site, manual excavation and backfill, <br />installation of system conduits and raceways for <br />electrical, telephone, cable television and comnmunication <br />systems. Pulling, terminating and splicing of traffic <br />signal and street lighting conductors and electrical <br />systems including interconnect, dector loop, fiber optic <br />cable and video/data. <br />---------------------------------------------------------------- <br />ELEC1245-0O1 06/01/2022 <br />Rates Fringes <br />LINE CONSTRUCTION <br />(1) Lineman; Cable splicer..$ <br />64.40 <br />22.58 <br />(2) Equipment specialist <br />(operates crawler <br />tractors, commercial motor <br />vehicles, backhoes, <br />trenchers, cranes (50 tons <br />and below), overhead & <br />underground distribution <br />line equipment) .............$ <br />50.00 <br />21.30 <br />(3) Groundman...............$ <br />38.23 <br />20.89 <br />(4) Powderman...............$ <br />51.87 <br />18.79 <br />HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, <br />Independence Day, Labor Day, Veterans Day, Thanksgiving Day <br />and day after Thanksgiving, Christmas Day <br />---------------------------------------------------------------- <br />ELEVOOI8-OO1 01/01/2022 <br />Rates Fringes <br />ELEVATOR MECHANIC ................ $ 61.34 36.885+a+b <br />FOOTNOTE: <br />a. PAID VACATION: Employer contributes 8% of regular hourly <br />rate as vacation pay credit for employees with more than 5 <br />years of service, and 6% for 6 months to 5 years of service. <br />b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence <br />Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday <br />after Thanksgiving, and Christmas Day. <br />---------------------------------------------------------------- <br />ENGI0012-003 07/01/2020 <br />Rates Fringes <br />OPERATOR: Power Equipment <br />(All Other Work) <br />GROUP 1....................$ 48.25 27.20 <br />GROUP 2....................$ 49.03 27.20 <br />GROUP 3....................$ 49.32 27.20 <br />https://sam.govtwage-determination/CA20220024/15 6/25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.