My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 10 - Amend CIP for the West Willits Protected Bike Lanes from Fairview Street to Raitt Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 11:58:53 AM
Creation date
8/11/2023 9:27:10 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
10
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 'B" <br />10/18/22, 8:40 AM <br />SAM.gov <br />GROUP <br />4....................$ <br />50.81 <br />27.20 <br />REBID <br />GROUP <br />5....................$ <br />48.96 <br />25.25 <br />GROUP <br />6....................$ <br />51.03 <br />27.20 <br />GROUP <br />8....................$ <br />51.14 <br />27.20 <br />GROUP <br />9....................$ <br />49.29 <br />25.25 <br />GROUP <br />10....................$ <br />51.26 <br />27.20 <br />GROUP <br />11....................$ <br />49.41 <br />25.25 <br />GROUP <br />12....................$ <br />51.43 <br />27.20 <br />GROUP <br />13....................$ <br />51.53 <br />27.20 <br />GROUP <br />14....................$ <br />51.56 <br />27.20 <br />GROUP <br />15....................$ <br />51.64 <br />27.20 <br />GROUP <br />16....................$ <br />51.76 <br />27.20 <br />GROUP <br />17....................$ <br />51.93 <br />27.20 <br />GROUP <br />18........ ............ $ <br />52.03 <br />27.20 <br />GROUP <br />19....................$ <br />52.14 <br />27.20 <br />GROUP <br />20....................$ <br />52.26 <br />27.20 <br />GROUP <br />21....................$ <br />52.43 <br />27.20 <br />GROUP <br />22....................$ <br />52.53 <br />27.20 <br />GROUP <br />23....................$ <br />52.64 <br />27.20 <br />GROUP <br />24....................$ <br />52.76 <br />27.20 <br />GROUP <br />25....................$ <br />52.93 <br />27.20 <br />OPERATOR: <br />Power Equipment <br />(Cranes, Piledriving & <br />Hoisting) <br />GROUP <br />1....................$ <br />49.60 <br />27.20 <br />GROUP <br />2....................$ <br />50.38 <br />27.20 <br />GROUP <br />3....................$ <br />50.67 <br />27.20 <br />GROUP <br />4....................$ <br />50.81 <br />27.20 <br />GROUP <br />5....................$ <br />51.03 <br />27.20 <br />GROUP <br />6....................$ <br />51.14 <br />27.20 <br />GROUP <br />7....................$ <br />51.26 <br />27.20 <br />GROUP <br />8....................$ <br />51.43 <br />27.20 <br />GROUP <br />9....................$ <br />51.60 <br />27.20 <br />GROUP <br />10....................$ <br />52.60 <br />27.20 <br />GROUP <br />11....................$ <br />53.60 <br />27.20 <br />GROUP <br />12....................$ <br />54.60 <br />27.20 <br />GROUP <br />13.................... $ <br />55.60 <br />27.20 <br />OPERATOR: <br />Power Equipment <br />(Tunnel Work) <br />GROUP <br />1....................$ <br />50.10 <br />27.20 <br />GROUP <br />2....................$ <br />50.88 <br />27.20 <br />GROUP <br />3....................$ <br />51.17 <br />27.20 <br />GROUP <br />4....................$ <br />51.31 <br />27.20 <br />GROUP <br />5....................$ <br />51.53 <br />27.20 <br />GROUP <br />6....................$ <br />51.64 <br />27.20 <br />GROUP <br />7....................$ <br />51.76 <br />27.20 <br />PREMIUM PAY: <br />$3.75 per hour shall be paid on all Power Equipment Operator <br />work on the followng Military Bases: China Lake Naval <br />Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, <br />Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics <br />Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp <br />Pendleton <br />Workers required to suit up and work in a hazardous material <br />environment: $2.00 per hour additional. Combination mixer <br />and compressor operator on gunite work shall be classified <br />as a concrete mobile mixer operator. <br />SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS <br />POWER EQUIPMENT OPERATORS CLASSIFICATIONS <br />GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch <br />https://sam.gov/wage-determination/CA20220024/15 7/25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.