Laserfiche WebLink
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6995 <br />BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO.: HSIPL 5063(204) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Elecnor Belco Electric, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Modification <br />1 <br />LS <br />$ <br />$ <br />ZG3,000 <br />24.63,000 <br />2 <br />Install Video Detection System at <br />Bristol St Santa Clara Ave <br />1 <br />LS <br />$ <br />y2,300 <br />$ <br />421300 <br />and <br />3 <br />* Install 2" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />'7� <br />7.000 <br />4 <br />* Install 3" PVC Conduit per Plan <br />100 <br />LF <br />$ <br />$ <br />100 <br />10,000 <br />5 <br />* Install 4" PVC Conduit per Plan <br />500 <br />LF <br />S� <br />S <br />M D, 000 <br />6 <br />* Install No. 6 Pull Box <br />6 <br />EA <br />$I,zOS <br />1,230 <br />7 <br />* Install No. 6E Pull Box <br />2 <br />EA <br />t' Sgs <br />$ <br />170 <br />8 <br />* Remove and Replace Concrete <br />100 <br />SF <br />$ <br />$ <br />Sidewalk <br />(vq .50 <br />(oq$O <br />9 <br />Cold Mill (2") <br />5900 <br />SF <br />$ <br />$ <br />Z.-IS <br />1(o,Z7-S <br />10 <br />Asphalt Rubber Hot Mix (ARHM) <br />74 <br />TN <br />$ <br />$ Z ?io <br />-703.24 <br />11 <br />Temporary Overhead Wiring at <br />I <br />LS <br />$ <br />$ <br />Bristol St and Santa Clara Ave <br />t(o' Sb0 <br />1(0, S00 <br />12 <br />Pothole Pole Locations for Utility <br />Conflicts <br />8 <br />EA <br />$ 060 <br />$(0' goo <br />13 <br />Pothole Utility Not Shown on Plans <br />4 <br />EA <br />$ <br />Q SO <br />$ <br />100 <br />15] <br />P-1 of P-16 <br />