My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
03/07/2023 Special and Regular
>
Item 12 - Construction Contract for Bristol Street and Santa Clara Avenue Traffic Signal Modification
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2024 12:01:05 PM
Creation date
8/11/2023 9:28:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
3/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 22-6995 <br />BRISTOL ST AND SANTA CLARA AVE TRAFFIC SIGNAL MODIFICATION <br />FEDERAL PROJECT NO.: HSIPL 5063(204) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Signing and Striping <br />1 <br />LS <br />$ <br />10, 13o <br />$ <br />to, k30 <br />15 <br />Project Advertising Sign(s) <br />2 <br />EA <br />$ <br />11000 <br />$ <br />21,000 <br />16 <br />Construction Permit(s) <br />1 <br />LS <br />$6,500 <br />$ (O ,50O <br />TOTAL BASE BID — BID ITEMS 1-16 5W <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within sixty (60) working dates, after the commencement date stated in the Notice to <br />Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $3,200 per calendar day. <br />Name of Firm Elecnor Belco Electric, <br />Signature of BIDDER <br />Title Vice President <br />, John Wong <br />(If an individual, so state. If f co -partnership, state the firm name and give the names of <br />'141all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />Alberto Garcia De Los Angeles / President John Wong / Vice President <br />Pedro Enrile / Secretary <br />Jeroni Gervilla / Treasurer <br />yg312-44.?6 <br />P-2 of P-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.