Laserfiche WebLink
<br /> Hazard Mitigation Plan | 2022 <br />Mitigation Strategies <br />- 116 - <br /> Mitigation Action Item Lead Department Timeline Goal: Protect Life and Property Goal: Public Awareness Goal: Natural Systems Goal: Emergency Services Goal: Partnerships and Implementation Buildings & Infrastructure: Does the Action item involve New and/or Existing Buildings and/or Infrastructure? Yes (Y), No (N) Funding Source and Planning Mechanism: B – Budget, CIP – Capital Improvement Program, , HMGP- Hazard Mitigation Grant Program, BRIC – Building Resilient Infrastructure and Communities Grant, EMPG – Emergency Management Planning Grant Benefit: L-Low, M-Medium, H-High Cost: L-Low, M-Medium, H-High Priority: L-Low, M-Medium, H-High EQ-13 Seismic evaluation of reservoir and <br />pump stations. <br /> <br /> <br /> <br />Water Resources <br />Division 5 years X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />L L L <br />Flooding Mitigation Action Items <br />FLD-1 Due to potential for flood damage and <br />overall security, relocate the main City of <br />Santa Ana I.T. server room from City Hall <br />Basement to the Police Department. <br />Information <br />Technology 2 years X Y CIP H H H <br />FLD-2 Improve drainage at City Hall loading <br />dock. The loading dock has a 12-foot drop <br />from street level. A poor drainage system <br />and high rains in 2018 caused severe <br />damage to basement. There are several key <br />City services located on the basement level. <br />Modifications would include increasing <br />surface area of drain grates, increasing slope <br />and piping size from grates to sump pumps <br />Public Works Complete X X Y CIP H L H