My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Updated Hazard Mitigation Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
01/17/2023 Regular & Special SA
>
Item 26 - Updated Hazard Mitigation Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 10:34:37 AM
Creation date
8/11/2023 10:33:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
1/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Hazard Mitigation Plan | 2022 <br />Mitigation Strategies <br />- 117 - <br /> Mitigation Action Item Lead Department Timeline Goal: Protect Life and Property Goal: Public Awareness Goal: Natural Systems Goal: Emergency Services Goal: Partnerships and Implementation Buildings & Infrastructure: Does the Action item involve New and/or Existing Buildings and/or Infrastructure? Yes (Y), No (N) Funding Source and Planning Mechanism: B – Budget, CIP – Capital Improvement Program, , HMGP- Hazard Mitigation Grant Program, BRIC – Building Resilient Infrastructure and Communities Grant, EMPG – Emergency Management Planning Grant Benefit: L-Low, M-Medium, H-High Cost: L-Low, M-Medium, H-High Priority: L-Low, M-Medium, H-High and modifying curbs at the bottom of ramp to <br />better utilize both drainage grates. <br />FLD-3 Improve the various significantly <br />undersized existing City storm drain systems <br />by installing additional drains, increasing <br />capacity, or re-routing. <br />Public Works 5-25 years Y HMP, BRIC, <br />EMPG H H H <br />FLD-4 City-owned facilities will use porous <br />pavement, vegetative buffers, and islands in <br />large parking areas, where feasible. (Source: <br />NPDES) <br />Public Works, <br />Planning and <br />Building <br />Ongoing X X X Y B M L L <br />FLD-5 Encourage the use of permeable <br />pavements or other infiltration BMPs to <br />reduce runoff and increase groundwater <br />recharge. (NPDES) <br />Public Works, <br />Planning and <br />Building <br />Ongoing X X X Y B M L L <br />FLD-6 Fund and complete an update to the <br />Stormwater Project Master Plan Public Works 1-5 years X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />H H H <br />FLD-7 Prepare and adopt a Storm Drain <br />Master Plan. Public Works Completed <br />2018 X X Y B H H H
The URL can be used to link to this page
Your browser does not support the video tag.