Laserfiche WebLink
<br /> Hazard Mitigation Plan | 2022 <br />Mitigation Strategies <br />- 118 - <br /> Mitigation Action Item Lead Department Timeline Goal: Protect Life and Property Goal: Public Awareness Goal: Natural Systems Goal: Emergency Services Goal: Partnerships and Implementation Buildings & Infrastructure: Does the Action item involve New and/or Existing Buildings and/or Infrastructure? Yes (Y), No (N) Funding Source and Planning Mechanism: B – Budget, CIP – Capital Improvement Program, , HMGP- Hazard Mitigation Grant Program, BRIC – Building Resilient Infrastructure and Communities Grant, EMPG – Emergency Management Planning Grant Benefit: L-Low, M-Medium, H-High Cost: L-Low, M-Medium, H-High Priority: L-Low, M-Medium, H-High FLD-8 Increase dimensions of drainage <br />culverts in flood-prone areas. Public Works Ongoing X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />H H H <br />FLD-9 At City-owned facilities, perform <br />regular drainage system maintenance, such <br />as sediment and debris clearance, as well as <br />detection and prevention of discharges into <br />stormwater and sewer systems from home <br />footing drains, downspouts, or sewer pumps. <br />Public Works Ongoing X X Y B H H H <br />FLD-10 Floodproofing water and wastewater <br />treatment facilities located in flood hazard <br />areas. <br />Water Resources Ongoing X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />H H H <br />FLD-11 Install and/or upgrade stormwater <br />pumping stations. Completed include First <br />Street lift station and Civic Center lift stations. <br />Public Works Complete X X Y CIP H H H <br />FLD-12 Installing back-up generators or <br />other power sources for pumping and lift <br />stations in sanitary sewer systems along with <br />Water Resources 1-5 years X X Y <br />B, CIP, <br />HMGP, BRIC, <br />EMPG <br />H H H