My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Building Forward: Library Infrastructure Grant Agreement
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 13 - Building Forward: Library Infrastructure Grant Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:52:08 PM
Creation date
8/11/2023 3:51:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Main Library <br /> 2021-2022 BF-1-21-053 <br /> Page 16 <br /> <br />of this Agreement, or other combination of exhibits specified on the Grant <br />Agreement Coversheet attached hereto (collectively referred to as “Terms”). <br />Grantee’s State Library-approved Application (Grantee’s Application) is hereby <br />incorporated herein by this reference. In the event of conflict or inconsistency <br />between the articles, exhibits, attachments, specifications or provisions that <br />constitute this Agreement, the following order of precedence shall apply: <br />a. Grant Agreement Coversheet and any Amendments thereto <br />b. Terms and Conditions <br />c. Procedures and Requirements <br />d. Certificate of Compliance <br />e. Project Summary <br />f. Grantee’s approved outputs from the submitted application (including <br />Budget and Implementation plan submitted as part of the required <br />award documents) <br />g. All other attachments hereto, including any that are incorporated by <br />reference. <br />30. Payment: <br />a. The approved Budget, if applicable, is attached hereto and incorporated <br />herein by this reference and states the maximum amount of allowable <br />costs for each of the tasks identified in the Implementation Plan submitted <br />as part of the required award documents. The State Library shall provide <br />funding to the Grantee for only the work and tasks specified in the list of <br />approved outputs at only those costs specified in the Budget submitted as <br />part of the required award documents and incurred in the term of the <br />Agreement. <br />b. The Grantee shall carry out the work described in the Implementation Plan <br />in accordance with the approved Budget and shall obtain the Grant <br />Monitor’s written approval of any changes or modifications to the <br />Implementation Plan, approved project outputs, or the approved Budget <br />prior to performing the changed work or incurring the changed cost. If the <br />Grantee fails to obtain such prior written approval, the State Librarian or <br />designee, at his or her sole discretion, may refuse to provide funds to pay <br />for such work or costs. <br />c. The Grantee shall request funds in accordance with the funding schedule <br />included in this Agreement. <br />d. Ten percent (10%) will be withheld from the Payment Request (if <br />applicable) and paid at the end of the grant term, when all reports and <br />conditions stipulated in this Agreement have been satisfactorily <br />completed. Failure by the grantee to satisfactorily complete all reports <br />and conditions stipulated in this Agreement may result in forfeiture of any <br />such funds withheld. DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.