Laserfiche WebLink
Willard Neighborhood Water and Sewer Main Improvements <br />December 20, 2022 <br />Page 2 <br />and general service quality will improve significantly. In addition, the potential for <br />disruption due to water main breaks will be substantially reduced. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was <br />advertised in the Orange County Register newspaper on September 27 and October 4, <br />2022. The project was also advertised on PlanetBids, and bids were received <br />electronically via PlanetBids on October 18, 2022. <br />The City notified a total of 624 regional vendors via PlanetBids, 18 of which are Santa <br />Ana based. Fifty-five vendors requested bidding documents. A total of eleven bids were <br />received. However, no bids were received from Santa Ana contractors. <br />Bid Results Summ <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Big Ben, Inc. <br />Irvine <br />$3,163,400.00 <br />2 <br />Dominguez General Engineering, Inc. <br />Pomona <br />$3,619,000,00 <br />3 <br />TE Roberts, Inc. <br />Orange <br />$3,776,850.00 <br />4 <br />Lucas Builders, Inc. <br />La Habra <br />$4,156,900.00 <br />5 <br />Griffith Company. <br />Brea <br />$4,172,713.00 <br />6 <br />SRK Engineering. <br />Escondido <br />$4,241,300.00 <br />7 <br />Aid Builders, Inc. <br />Los Alamitos <br />$4,467,840.00 <br />8 <br />Stephen Doreck Equipment Rentals, <br />Inc. <br />Pico Rivera <br />$4,817,060.00 <br />9 <br />ARB, Inc. <br />Lake Forest <br />$5,009,575.00 <br />10 <br />Excel Paving Co. <br />Long Beach <br />$5,189,950.00 <br />11 <br />Mike Bubalo Construction Co., Inc. <br />Gardena <br />$5,496,250.00 <br />Of the eleven bids received, all were deemed responsive. Big Ben, Inc., submitted the <br />lowest responsive base bid, in the amount of $3,163,400 (Exhibit 2). As specified in the <br />bid documents, the lowest bid shall be determined on the basis of the Base Bid. Based <br />on the bid analysis and a contractor's reference check, staff recommends awarding the <br />construction contract to Big Ben, Inc., in the amount of the base bid totaling $3,163,400 <br />(Exhibit 3). Big Ben, Inc., has performed the following work in the City of Santa Ana <br />within the past 5 years: Baker -Glenwood Sewer Main Upgrade (Project No. 21-6446), <br />and Lincoln Avenue Water & Sewer Main Improvements (Project Nos. 22-6468 & 22- <br />6620). <br />