My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 16 - Amend Agreements for Renewable Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2023 3:53:07 PM
Creation date
8/11/2023 3:52:49 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />07/07/2022 - Proposal No: Q-00390 Quote Valid until: 12/31/2022 <br />Opal Fuels - 10225 Philadelphia Court, Rancho Cucamonga, 91730 | 909-793-3700 | (fax) 909-793-8056 | www.opalfuels.com <br />COMPRESSOR AREA EQUIPMENT <br /> <br />Manual Transfer Switch - 800 amp (400 total hp max) - Qty 1 - Included <br />BACKUP GENERATOR PROVISIONS - 800 Amp / 400 hp Total hp Capacity: Compressor control system includes a <br />backup generator hook up provision capable of running either compressor A or compressor B in the event of power loss. <br />Design includes a manual transfer switch to change power from primary power source to back up power. The system <br />requires a backup power generator (not included) sized to produce: [350 KVA per 200 hp compressor] or [700 KVA per <br />two 200 hp compressors] or [700 KVA per one 400 hp compressor.] <br />(3) 37' Tubes - 60,290 scf - 476 GGE - Qty 1 - Included <br />Each tube is 37'L 20" OD x 1.303" MW. Nominal water volume for three tubes is 168.9 cu.ft. Nominal CNG capacity for <br />three tubes is 60,290 scf @ 5,500 psi. Total fuel capacity for three tubes is 476 GGE. Tubes comply with NFPA 52.4.4.5 <br />(ASME Compliance). Includes 1" ball valves, NPT fittings, I-beam construction and vent stack. <br />Compressor Pad(s) - Qty 2 - Included <br />Excavation, conduit, backfill and compaction, concrete pad, bollard protection <br />Pad for Storage Tanks - Qty 1 - Included <br />Concrete Pad for Storage Tanks <br />Housekeeping Pad - concrete - Qty 1 - Included <br />The finished area around the compressor pads will be finished with 4 inches of concrete. <br />Opal Fuels job site container (Required) - Qty 1 - Included <br />Delivery and retrieval of Opal Fuels job site container <br />Trenching & backfill from utility to CNG equipment compound through concrete - Included <br />Trenching & backfill from utility to CNG equipment compound through concrete <br />Electrical Base (for compressor(s)) - Qty 2 - Included <br />Electrical Base for ANGI 300/600 Compressor(s) <br />Electrical conduits & Wire from Existing Switchboard to CNG equipment compound - 650’ - Included <br />Electrical conduits from utility to CNG equipment compound $ per linear ft / no wire <br />20' Dual-Head LED Parking Lot Light for Compound Area - Qty 1 - Included <br />A dual 400-watt LED lamp mounted on a one-piece aluminum post. Each lamp enclosure measures 15" x 22". This light <br />post includes dual LED lamp enclosures. The light post is 20' in height and mounted in a 18' concrete caisson. <br />FF / TF Buffer Storage Panel 2 Zone - Qty 1 - Included <br />Priority buffer panel capable of dispensing CNG for fast fill, is included for high-flow capability. 1" Buffer-Valve panel <br />includes ESD valve mounted and racked to storage in NEMA 1 Panel. Ideal for applications where average vehicle fill is <br />more than 30 GGE/DGE. Compatible with high-flow CNG nozzles that can flow up to 25 GGE per minute average 9 GGE <br />per minute flow capacity or greater. Includes Qty. 1 buffer valve in 1 cabinet. One buffer panel controls the filling <br />operation for up to 3 dispensers. The 1” time fill valve is included in the same cabinet for time fill application to provide
The URL can be used to link to this page
Your browser does not support the video tag.