My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Safe Routes to School Davis Elementary Access Compliance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 18 - Safe Routes to School Davis Elementary Access Compliance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 2:10:13 PM
Creation date
8/11/2023 3:53:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
12/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safe Routes to School Davis Elementary Access Compliance <br />December 20, 2022 <br />Page 2 <br />driveways, sidewalks, and curb ramps, and removing some asphalt roadway sections to <br />build concrete build -outs to encourage slower traffic speeds. <br />The construction scope of work includes installation of bulb -outs at crossings adjacent <br />to Davis Elementary School, reconstruction and installation of curb ramps, sections of <br />sidewalks, curb and gutter, water quality BMPs, signing & striping, construction of PCC <br />pavement, AC pavement and driveways along the safe routes to school (Exhibit 2). <br />Public Outreach and Contractor Particiaation <br />To provide an opportunity for local vendors to submit bids, the City notified a total of 33 <br />regional vendors via PlanetBids, many of which are Santa Ana based. A total of three <br />bids were received however, no bids were received from any Santa Ana contractors. <br />As legally required, a Notice Inviting Bids was advertised in the Orange County Register <br />newspaper on September 6t" and 13t", 2022. The project was also advertised in <br />PlanetBids from September 7t", 2022 through October 5t", 2022. Bids were received <br />electronically via PlanetBids on October 5t", 2022. No formal bid protest was submitted <br />by any bidders during the bid protest period. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Palp, Inc DBA Excel Paving <br />Long Beach <br />$5,558,420.00 <br />Company <br />2 <br />Hardy & Harper, Inc. <br />Lake Forest <br />$6,500,000.00 <br />NR <br />Klassic Engineering and <br />Orange <br />Non -Responsive <br />Construction, Inc. <br />A total of three bids were received and of the three bidders, Klassic Engineering and <br />Construction, Inc. was non -responsive. Palp, Inc. DBA Excel Paving Company <br />submitted the lowest responsive base bid in the amount of $5,558,420 (Exhibit 3). As <br />specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to Palp, Inc. DBA Excel Paving <br />Company, in the amount of the base bid totaling $5,558,420 (Exhibit 4). Palp, Inc. DBA <br />Excel Paving Company, has performed the following work in the City of Santa Ana <br />within the past 5 years: Misc. Storm Drain Repairs (Project No. 21-6458), Bush Street <br />Bicycle Blvd. from Civic Center to 17t" St. (Project No. 18-9002), Traffic Signal and <br />Bulb -Outs at Bishop -Pacific -Shelton Bicycle Improvements (Project No. 15-6848), 3rd <br />Street Traffic Calming from Birch to Spurgeon (Project No. 15-6606) and Residential <br />Street Repair FY 14/15 Project No. 15-6836). <br />
The URL can be used to link to this page
Your browser does not support the video tag.