My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 2:21:12 PM
Creation date
8/11/2023 4:02:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garry Avenue Business Park Amendment Application, Appeal Applications, and <br />Conditional Use Permit — 1700, 1720, and 1740 East Garry Avenue <br />December 20, 2022 <br />Page 3 <br />Item <br />Information <br />South <br />Vacant (Alton Avenue right-of-way) and <br />Industrial <br />West <br />Costa Mesa SR-55 Freeway <br />Site Size <br />5.13 acres <br />Existing Site Development <br />Developed with three professional office buildings containing a <br />total of 105,558 square feet, constructed between 1972 and <br />1974 <br />Use Permissions <br />Allowed with approval of a zone change and CUP <br />Zoning Code Sections <br />Affected <br />Development Standards <br />Section 41-471 et seq. <br />Uses <br />Section 41-472.5 i <br />Project Description <br />The applicant is requesting to demolish three office buildings with a total of 105,558 <br />square feet to construct a 91,500-square foot, 43.5-tall industrial building for warehousing <br />and distribution purposes. Of the total square footage, 81,500 square feet will be used for <br />warehousing and distribution activities, and 10,000 square feet will be used for <br />supportive/ancillary office areas. A total of 10 loading docks will be provided at the rear <br />(south) portion of the building. The building has been designed to allow the construction <br />of future demising wall to create two tenant spaces. <br />In addition to the new structure, the site will be improved with new landscaping, paving, <br />onsite parking, and improvements to the public right-of-way. The improvements include <br />onsite landscaping and a landscape edge along the SR-55 Freeway that takes into <br />account the freeway's future widening, scheduled to begin in 2022. In addition, the project <br />site will provide 145 onsite parking spaces, an onsite employee amenity area, enhanced <br />paving at driveway entrances, new curb and gutter, street lights, and paving along the <br />project frontage on Garry Avenue. Although not required, the project will provide an onsite <br />walkway for pedestrians along the project frontage. <br />The design of the structure is contemporary, with exterior finishes that would enhance the <br />building's presence along the SR-55 Freeway. The building will contain a mixture of <br />materials, including performance vision glass, metal awnings, and concrete panels <br />painted in white, various shades of tan and brown, and soft green hues. The building's <br />elevations have been designed to allow for placement of future wall signage to ensure <br />compliance with applicable SAMC requirements. The project is intended to be <br />constructed in a single phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.