My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 2:21:12 PM
Creation date
8/11/2023 4:02:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Plan Exemption Checklist <br />City of Santa Ana Gary Avenue Business Park Project <br />1. The project is consistent with: <br />a. A community plan adopted as part of a general plan, <br />b. A zoning action which zoned or designated the parcel on which the project would be located <br />to accommodate a particular density of development, or <br />c. A general plan of a local agency, and <br />2. An EIR was certified by the lead agency for the zoning action, the community plan, or the general <br />plan. <br />Furthermore, the exemption applies when all feasible mitigation measures identified in the applicable <br />general plan are implemented by the public agency with jurisdiction to require such mitigation measures <br />(State CEQA Guidelines Section 151 83(e)). <br />The GPU EIR was certified in 2022, which analyzed the impacts of the City's GPU, which was adopted. As <br />discussed in this exemption checklist, the Project is consistent with the development standards analyzed in the <br />GPU EIR. The Project site is located within the GPU 55 Freeway / Dyer Road Focus Area. The General Plan <br />(Land Use Element Page 54) describes that this focus area will transition from a portion of the city that is <br />almost exclusively focused on professional office jobs to one that supports a range of commercial, <br />industrial/flex, and mixed -use development. <br />The Project site has a GPU designation of FLEX-3 that allows a FAR of 3.0 and building heights up to 10- <br />stories. The FLEX-3 designation allows for clean industrial uses that do not produce significant air pollutants, <br />noise, or other nuisances typically associated with industrial uses, including office -industrial flex spaces, small- <br />scale clean manufacturing, research, and development. <br />The GPU identifies (on Table LU-A-1) that the Interim Development Standard for the FLEX-3 area is M1 <br />(Light Industrial). The M1 zone provides for a variety of light industrial uses, including warehousing, <br />manufacture, assembly, machine shops, wholesale businesses. The M1 zone provides requirements for <br />minimum lot sizes or 12,000 square feet with 100 feet of street frontage, building height (a maximum of 35 <br />feet), setback requirements from public streets, landscaping requirements. The M-1 zone does not have <br />density requirements. The Project would result in a FAR of 0.42, which is within the projections of the GPU <br />EIR, which evaluated a density of 3.0 FAR on the site. As such, the GPU EIR adequately anticipated and <br />analyzed the impacts of this Project, identified applicable mitigation measures necessary to reduce impacts <br />of the Project, and the Project implements the applicable mitigation measures. The Project, therefore, <br />qualifies for an exemption from additional environmental review as set forth in State CEQA Guidelines <br />Section 15183. <br />Specifically, the Project qualifies for the exemption because the following findings can be made: <br />1. The Project is consistent with the development density established by existing zoning, <br />community plan or general plan policies for which an EIR was certified. The Project would result <br />in a FAR of 0.42, which is less than the maximum FAR of 3.0 allowable in the FLEX-3 designated <br />area, which is the development density established by the GPU and analyzed in the GPU EIR. The <br />Project site has an Interim Development Standard of M-1 (light Industrial zone). The M-1 zone does <br />not have density requirements. <br />2. There are no Project specific effects which are peculiar to the Project or its site, and which the <br />GPU EIR failed to analyze as significant effects. The subject property is similar to other properties <br />in the area, including its land use designation and zoning. The property does not support any peculiar <br />environmental features, and the Project would not result in any peculiar effects. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.