My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/20/2022 Special & Regular
>
Item 41 - Amendment Application No. 2022-01 and Appeal Nos. 2022-01 and 2022-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 2:21:12 PM
Creation date
8/11/2023 4:02:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
12/20/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garry Avenue Business Park Amendment Application, Appeal Applications, and <br />Conditional Use Permit — 1700, 1720, and 1740 East Garry Avenue <br />December 20, 2022 <br />Page 9 <br />meeting; however, the applicant held two communities in order to provide ample public <br />input opportunities to surrounding property owners. Both meetings were conducted <br />virtually due to the ongoing impacts of the Covid-19 pandemic at the time. <br />The first community meeting was held July 8, 2021. Ten members of the community <br />attended and posted questions relating to construction impacts and the site plan design. <br />Because of this meeting, the original site plan was rotated 90 degrees clockwise to orient <br />the loading docks from facing east to facing south, to minimize impacts onto properties to <br />the north and east of the site. The second community meeting was held October 5, 2021, <br />during which 11 members of the community attended and expressed satisfaction with the <br />revised site plan and posed questions about traffic control, site screening, and <br />construction impacts. Materials from both community meetings are included with this <br />report as Exhibit 11, and all materials were published to the project's webpage on the <br />City's website at santa-ana.org/garry-avenue-business-park. <br />ENVIRONMENTAL IMPACT <br />Pursuant to the California Environmental Quality Act (CEQA) and the CEQA Guidelines, <br />the project is exempt from further review pursuant to 15183 of the CEQA Guidelines. This <br />type of exemption analysis evaluates whether the potential environmental impacts of the <br />proposed demolition of three office buildings, which total 105,558 square feet, and <br />construction of a new 91,500 square foot light industrial warehousing building that would <br />accommodate two tenants are addressed in the City of Santa Ana General Plan Update <br />Final Recirculated Program Environmental Impact Report (GPU EIR). <br />As set forth in California Public Resources Code (PRC) Section 21083.3 and State CEQA <br />Guidelines Section 15183, projects that are "consistent with the development density <br />established by the existing zoning, community plan or general plan policies for which an <br />EIR was certified shall not require additional environmental review, except as might be <br />necessary to examine whether there are project -specific significant effects which are <br />peculiar to the project or its site" (State CEQA Guidelines Section 15183(a) and PRC <br />Section 21083.3(b)). The State CEQA Guidelines further state that "[i]f an impact is not <br />peculiar to the parcel or to the project, has been addressed as a significant effect in the <br />prior EIR, or can be substantially mitigated by the imposition of uniformly applied <br />development policies or standards [... ] then an additional EIR need not be prepared for <br />the project solely on the basis of that impact" (State CEQA Guidelines Section 15183(c))." <br />The GPU was adopted, and the GPU EIR certified, in April 2022 (State Clearinghouse <br />Number 2020029087); the GPU went into effect on May 26, 2022. Any decision by the <br />City affecting land use and development must be consistent with the GPU. The GPU EIR <br />evaluates the potential environmental effects associated with implementation of the GPU <br />and addresses appropriate and feasible mitigation measures that would minimize or <br />eliminate these impacts. A project is consistent with the GPU if the development density <br />does not exceed what was contemplated and analyzed for the parcel(s) in the certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.