My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Design Services for Santa Ana's First Dog Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 18 - Design Services for Santa Ana's First Dog Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 3:05:35 PM
Creation date
8/11/2023 4:44:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
12/6/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical specifications for all components <br />listed above will be provided in CSI format. MIG <br />will coordinate language between the general <br />and technical specifications to ensure conflicts <br />are minimized. City staff will combine these <br />specifications with the City Boiler Plate, which <br />together will become the Project Manual. <br />2.4 FINALIZED OPINION OF PROBABLE COST <br />MIG will provide an updated opinion of probable <br />cost that will reflect finalized plans, materials, <br />systems details of construction, and known <br />anticipated changes in the bidding market relative <br />to the project. If the project exceeds the available <br />budget, project plans and specifications will be <br />phased as appropriate. <br />2.5 ELECTRONIC FILES <br />Electronic files for all AutoCAD, reports, and <br />calculations shall be submitted at the end of <br />contract or when requested by the City. <br />MEETINGS: <br />Review meeting at 60% CD submittal to review <br />City comments (1 meeting) <br />Review meeting at 90% CD submittal to review <br />City comments (1 meeting) <br />DELIVERABLES: <br />Six (6) sets for 60% citywide review, comments, <br />and permits <br />Six (6) sets for 90% citywide review, comments, <br />and permits. <br />>> Three (3) copies of 60%, 90%, and final opinion <br />of probable costs (OPC) <br />>> One (1) copy of stamped and signed originals <br />of construction drawings for bidding phase <br />reproduction on bond paper. <br />» One (1) copy of 60%, 90%, and final technical <br />specifications. <br />>> One (1) electronic copy (disk) of construction <br />documents for City records. <br />Task 3 — Bid Advertisement, Construction <br />Administration, Record Drawings <br />3.1 PRE -BID MEETING <br />MIG will attend the pre -bid conference and answer <br />questions from prospective bidders (1 meeting). <br />3.2 RFI CLARIFICATIONS & ADDENDA AS <br />NECESSARY DURING BIDDING <br />MIG will provide RFI clarifications as necessary <br />and prepare addendums as needed to clarify <br />certain aspects or questions regarding the plans <br />that may arise during contractor bidding. <br />City of Santa Ana I Santa Ana Dog Park Design Services 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.