Laserfiche WebLink
3.3 PRE -CONSTRUCTION MEETING <br />3.9 AS -BUILT RECORD DRAWINGS <br />MIG will attend the pre -construction meeting <br />3.4 SITE REVIEWS (BI-WEEKLY) <br />MIG will attend bi-weekly site meetings to review <br />construction progress and a preliminary and <br />final inspection walk-through. (Anticipated 1 year <br />construction) <br />3.5 RFI BULLETINS AND INTERPRET PLANS AND <br />SPECIFICATIONS <br />MIG will respond to RFls and interpret plans and <br />specifications. <br />3.6 SHOP DRAWINGS SUBMITTAL REVIEWS <br />MIG will review and approve shop drawings and <br />samples within two weeks of receipt. Contract <br />Change order reviews will be completed within two <br />(2) working days. <br />3.7 POTENTIAL CHANGE ORDER REVIEWS <br />MIG will assist in reviewing and processing <br />requests for potential change orders, material <br />submittals, or equal products. <br />3.8 FINAL WALKTHROUGH AND CORRECTIVE <br />PUNCH LIST <br />MIG will prepare a preliminary and final corrective <br />punch list based on final review walkthrough. <br />MIG will provide the contractor with full-sized <br />bond drawings and AutoCAD CDs of the project <br />as part of our scope and cost for the contractor's <br />use for updating to as-built/record drawings. The <br />MIG Team will review and update the as -built/ <br />record drawings and close out documents for <br />completeness prior to turning them over to the City. <br />EXCLUSIONS: <br />The following services are not included in the <br />scope of services identified in the proposal: <br />>> Specification City "Boilerplate" and General <br />Conditions <br />>> Agronomic testing <br />>> Power Company Service Plans <br />>> Street improvement plans <br />>> Pot holing <br />>> Fire system design <br />» Off -site improvements <br />>> Pump station design <br />>> Mapping services (i.e., subdivision, private <br />easement, quick claims, ROW dedications, etc.) <br />18 City of Santa Ana I Santa Ana Dog Park Design Services <br />