My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Density Bonus Agreement No. 2022-03
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
12/06/2022 Regular
>
Item 21 - Density Bonus Agreement No. 2022-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2024 3:17:24 PM
Creation date
8/11/2023 4:46:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
12/6/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warmington Residential <br />717 S. Lyon St., Santa Ana, CA 92705 <br />Community Meeting — March 2, 2022 <br />ENGLISH PRESENTATION <br />1. INTRODUCTION <br />a. [Slide — cover slide] <br />b. Good evening everyone, welcome to the Community Meeting regarding the proposed <br />residential development of the property located at 717 S. Lyon Street in Santa Ana, <br />California by Warmington Residential. <br />c. My name is Greg Ocasek, the Project Consultant managing the entitlement process. <br />Here with me is: Joe Oftelie, Vice President here at Warmington, as well as Maribel <br />Maciel, Assistant Project Manager and our Spanish interpreter. <br />d. The format for tonight's meeting will consist of: <br />i. Our presentation in English <br />ii. Followed by a reading of the presentation in Spanish <br />iii. We are using the Zoom Webinar format, which will allow you to type in any <br />questions that you may have, by hitting the Q&A button. And, following the <br />reading of the presentation in Spanish, we will review the comments posted and <br />answer the questions that we can. <br />2. PRESENTATION <br />a. [Slide — aerial photo] <br />b. The proposed project will be a new residential townhome community featuring 51 for - <br />sale 3-story townhomes, including 8 affordable townhomes. <br />c. The site is 2.3 acres in size and is the home of the existing Orange County Electrical <br />Training Center. There are two (2) structures on site and a large parking lot. <br />d. The site's neighbors consist of: <br />i. North - Saddleback Park Villas <br />ii. East -Tustin Parc Apartments <br />iii. South - Las Fuentes Apartments <br />iv. West — Lyon Street (Warwick Square Apartments across street) <br />e. [Slide — site plan] <br />f. This townhome project will be a gated community made up of 12 residential buildings, <br />consisting of (1) duplex, (6) 4-plex buildings and (5) 5-plex buildings. <br />g. There will be 4 plan types that will range between 1,208 SF to 1,845 SF, with a range of 2 <br />bedroom/2.5 bathrooms to 3 bedrooms plus a den (optional 4t" bedroom) with 3.5 <br />bathrooms. <br />h. 8 of the 51 townhomes will be offered as low income affordable units. We do not have <br />information at this time regarding eligibility, pricing, or qualifications for purchasing any <br />of the homes, including the affordable homes. When construction starts on the project, <br />we will begin marketing all of the homes to the public. We don't expect construction to <br />start for at least 12 months from now. <br />
The URL can be used to link to this page
Your browser does not support the video tag.