Laserfiche WebLink
DBA No. 2022-03 — Warmington Residential <br />December 6, 2022 <br />Page 7 <br />containing "deviations" (incentives/concessions and/or waivers). The Planning <br />Commission's review of the density bonus agreement is based on the following findings: <br />1. The proposed development will materially assist in accomplishing the goal of <br />providing affordable housing opportunities in economically balanced communities <br />throughout the city. <br />2. The development will not be inconsistent with the purpose of the underlying zone <br />or applicable designation in the general plan land use element. <br />3. The deviation is necessary to make it economically feasible for the applicant to <br />utilize a density bonus authorized for the development pursuant to section 41- <br />1603. <br />Table 4: Analysis of the Requested Incentives/Concessions (1) and Waivers (3) <br />Standard <br />Analysis <br />Open Space <br />The total common open space required for the project site is equal to 15 <br />(Incentive/Concession) <br />percent of the lot, or approximately 15,028 square feet. Instead, the project <br />provides a 6,949-square-foot of common open space (7 percent), which is <br />a difference of 8,079 square feet or 8 percent. <br />Providing the required open space standard would lead to the elimination of <br />three or more units, which would affect the feasibility to construct the <br />project. In order to maintain the current proposed unit count, the developer <br />would be required to construct additional floor levels, which would exceed <br />the maximum allowable height as part of the Harbor Mixed Use Transit <br />Corridor Plan (SP-2), and would further increase development costs. To <br />help alleviate the open space deficiency, the project proposes an average <br />of 213 square feet of private open space per unit, through use of private <br />balconies/decks. This would exceed the minimum required private open <br />space of 90 square feet per unit. <br />Maximum Building <br />Pursuant to SP-2, the maximum building setback from the public right -of - <br />Setback (Waiver) <br />way and/or easement is 8'-0". As proposed, the project is designed to <br />exceed the maximum allowed setback, as two of the proposed buildings <br />would be located 9'-7" and 11'-4" from a utilities easement line. <br />The maximum setback outlined in SP-2 was originally intended for a more <br />urban corridor of Santa Ana (Harbor Boulevard), as a means of regulating <br />land development to achieve a specific urban form and which envisioned a <br />more multi -modal boulevard. The proposed project is located in a suburban <br />area of the City, with multi -family low- to medium -density developments. <br />The existing multi -family residential developments immediately adjacent to <br />the project site provide average front setbacks that exceed 10'-0" and <br />extend to 20'-0". Although exceeding the maximum allowable setback, the <br />proposed development is consistent with the existing multi -family <br />residences. Moreover, the design is focused on the placement of the <br />proposed buildings as a way to continue the existing character and overall <br />nei hborhood pattern along Lon Street. <br />