Laserfiche WebLink
0 <br />Proposal for <br />Various Environmental Services <br />Table 3. Schedule of Phase I ESA for Halladay Property <br /># <br />Activity <br />Pre- <br />Requisite <br />Activity <br />Duration <br />1 <br />Kickoff Meeting <br />-- <br />1 Day <br />2 <br />Site Visit and Interview <br />1 <br />1 Week <br />3 <br />Database Review <br />1 <br />1 Week <br />4 <br />Report Preparation <br />1, 2, and 3 <br />3 Weeks <br />Total Duration <br />4 Weeks <br />In case the City plans to conduct any renovation <br />or construction at the subject property, a <br />comprehensive hazardous material survey is <br />needed according to regulatory requirements. <br />Comprehensive Asbestos Assessment <br />Page 34 <br />August 1, 2022 <br />Deliverables: <br />✓ Comprehensive Asbestos Report <br />✓ Comprehensive Lead Assessment Report <br />This assessment will satisfy all the requirements of a pre -renovation assessment, in accordance with Cal - <br />OSHA Rule Title 8 CCR 1529 and NESHAPISCAQMD Rule 1403, as it pertains to this project only. <br />Our certified asbestos consultant or certified site surveillance technician (CAC or CSST) will conduct an <br />inspection of all areas and bulk sampling of suspect asbestos -containing materials (ACM), utilizing <br />AHERA sampling protocols. We will arrange for access to all locations. Our scope includes analysis of <br />suspect ACM samples by a NVLAP accredited laboratory, utilizing Polarized Light Microscopy (PLM) <br />with dispersion staining, in accordance with current regulatory requirements. Sample analysis is based on <br />standard 5 Day Laboratory Analysis. Additionally, we will review the proposed renovation plans, if <br />available. Upon receipt of laboratory results, A -Tech prepares a report that includes sample locations, <br />friability evaluations and remedial recommendations. <br />Comprehensive XRF-Lead Assessment <br />A -Tech will also conduct an inspection of all locations and <br />sampling of any suspect lead -containing materials (LCM) via <br />XRF, chip sampling of painted surfaces or bulk sampling of <br />ceramic/porcelain components by a CDPH Certified <br />The detailed cost estimate for <br />the Hazardous Material <br />Inspector/Assessor or Sampling Technician, utilizing Cal- <br />OSHA's and HUD sampling protocols. The analysis of suspect lead bulk samples will be performed by <br />an AIHA accredited laboratory, utilizing Flame Atomic Absorption (AAS) and/or Total Threshold Limit <br />Concentration (TTLC), in accordance with current regulatory requirements. Review of proposed <br />renovation plans, if available. Additionally, we will review the proposed renovation plans, if available. <br />Upon receipt of laboratory results, A -Tech prepares a report that includes sample locations, condition <br />evaluations and abatement/stabilization recommendations. The following are typical suspect lead - <br />containing materials found at this type of structure: Ceramic Tile, Painted Surfaces, and Porcelain Sinks <br />& Toilets. <br />0 A -Tech Consulting, Inc. <br />