My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Arc Flash Analysis and Safety Program Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
10/18/2022 Special and Regular
>
Item 17 - Arc Flash Analysis and Safety Program Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 11:34:49 AM
Creation date
8/14/2023 11:58:20 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
10/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEE PROPOSAL <br />P2S INC. <br />CITY OF SANTA ANA PUBLIC WORKS <br />ARC FLASH ANALYSIS & ELECTRICAL SAFETY PROGRAM <br />P"=s ENG <br />Category <br />PRINCIPAL ENGINEER <br />ENGINEER GRADE 05 <br />ENGINEER GRADE 04 <br />ENGINEER GRADE 03 <br />ENGINEER GRADE 02 <br />ENGINEER GRADE 01 <br />P2S INC. <br />RATE SCHEDULE FOR ENGINEERING SERVICES ON A <br />TIME AND EXPENSE BASIS <br />DESIGN ENGINEER GRADE 05 <br />DESIGN ENGINEER GRADE 04 <br />DESIGN ENGINEER GRADE 03 <br />DESIGN ENGINEER GRADE 02 <br />DESIGN ENGINEER GRADE 01 <br />DESIGNER GRADE 04 <br />DESIGNER GRADE 03 <br />DESIGNER GRADE 02 <br />DESIGNER GRADE 01 <br />CAD/BIM DESIGNER GRADE 04 <br />CAD/BIM DESIGNER GRADE 03 <br />CAD/BIM DESIGNER GRADE 02 <br />CAD/BIM DESIGNER GRADE 01 <br />COMMISSIONING GRADE 05 <br />COMMISSIONING GRADE 04 <br />COMMISSIONING GRADE 03 <br />COMMISSIONING GRADE 02 <br />COMMISSIONING GRADE 01 <br />PROJECTASSISTANT <br />In addition, for direct out-of-pocket expenses (if and when they occur) we quote the following <br />Rate <br />$329 <br />$276 <br />$267 <br />$229 <br />$211 <br />$187 <br />$229 <br />$211 <br />$187 <br />$166 <br />$147 <br />$157 <br />$147 <br />$135 <br />$129 <br />$130 <br />$118 <br />$105 <br />$96 <br />$276 <br />$239 <br />$204 <br />$163 <br />$140 <br />$96 <br />1) Automobile: <br />at current IRS rate per mile from home office for travel <br />outside Los Angeles, Orange, San Diego, San Bernardino, <br />Riverside & King counties <br />2) Travel Expense: <br />at Cost <br />3) Subsistence: <br />While away from home office for more than 1 day: at <br />Cost, but not to exceed $250 per day per person. <br />4) Plan Check Fees: <br />at Cost plus 10% markup <br />5) Third Party Services: <br />at Cost plus 1 0% markup <br />• Printing and copy services <br />• Consultant and subcontract professional fees <br />• Surveying / Soils Investigation <br />• Testing Laboratory Work <br />LIABILITY LIMITS <br />Professional Liability $ 2,000,000. <br />General Liability $ 5,000,000. <br />Effective January 1, 2022 — December 31, 2022 <br />RT-222 <br />
The URL can be used to link to this page
Your browser does not support the video tag.