FEE PROPOSAL CITY OF SANTA ANA PUBLIC WORKS
<br />P2S INC. ARC FLASH ANALYSIS & ELECTRICAL SAFETY PROGRAM
<br />Hampton Tedder Technical Services (HTTS) Terms and Conditions
<br />4563 State Street Day (909) 628-1256
<br />PA. Box 2338 Night (909) 628-1253
<br />Montclair. CA91763 09) 628-6375
<br />Hampton Tedder Technical Services Faxt�LlC#961649
<br />HIGH VOLTAGE MAINTENANCE, TESTING AND ENGINEERING
<br />TEST EQUIPMENT FEE SCHEDULE FY 2022
<br />DESCRIPTION
<br />TYPICAL EXAMPLE
<br />DAILY
<br />WEEKLY
<br />MONTHLY
<br />General Test Equipment
<br />5kv Insulation Tester (Megger)
<br />........................................................................
<br />120.00
<br />480.00
<br />1,440.00
<br />1.5kv Insulation Tester (Megger)
<br />........................................................................
<br />200.00
<br />600.00
<br />1,800.00
<br />Low Amperage DLRO (Ductor)
<br />10A..................................................................
<br />100.00
<br />360.00
<br />720.00
<br />High Amperage DLRO (Ductor)
<br />200A................................................................
<br />180.00
<br />540.00
<br />2,040.00
<br />CT Tester Single -Ratio
<br />EZ CT..............................................................
<br />300.00
<br />1,200.00
<br />4,080.00
<br />CT Tester Multi -Ratio
<br />EZ CT 2000....................................................
<br />420.00
<br />1,680.00
<br />5,760.00
<br />Infrared Camera
<br />Flir...................................................................
<br />480.00
<br />1,440.00
<br />4,800.00
<br />Earth Ground Tester
<br />6740, DET2/2..................................................
<br />120.00
<br />420.00
<br />1,560.00
<br />DC load bank 0-250 KW
<br />Eagle Eye ........................................................
<br />780.00
<br />2,340.00
<br />6,960.00
<br />Circuit Breaker Test Equipment
<br />Low Primary Current Test Set
<br />2kA or 5kA (CB832/845) ...............................
<br />240.00
<br />720.00
<br />2,160.00
<br />Mid Primary Current Test Set
<br />201cA Phenix HC 12C......................................
<br />600.00
<br />1,900.00
<br />4,200.00
<br />High Primary Current Test Set
<br />40kA or 50kA(BTS50/500/1000)..................
<br />1,000.00
<br />3,600.00
<br />7,200.00
<br />Motor Overload Test Set
<br />Multi -Amp MS I / MS2..................................
<br />100.00
<br />280.00
<br />780.00
<br />Time / Travel Analyzer
<br />Doble TR-lA, Programma Timer ...................
<br />300.00
<br />1,200.00
<br />4,080.00
<br />Secondary Injection Test Set
<br />Manufacturer Kit or Multi -Amp SCB100......
<br />240.00
<br />960.00
<br />3,240.00
<br />Relay / Transformer Test Equipment
<br />Phase Shifter
<br />Multi -Amp Model EPS 1000..........................
<br />180.00
<br />480.00
<br />1,680.00
<br />Frequency Generator
<br />Multi -Amp FG-50 / FG-60.............................
<br />180.00
<br />480.00
<br />1,680.00
<br />Variable Voltage/Current Supply
<br />Model MS-2....................................................
<br />125.00
<br />400.00
<br />1,500.00
<br />Recloser Test Set
<br />McGraw -Edison MET 573 .............................
<br />120.00
<br />480.00
<br />1,680.00
<br />Relay Test Set Active Source
<br />Single Phase (172500, F2253, 6300) ...............
<br />300.00
<br />1,200.00
<br />4,080.00
<br />Relay Test Set Active Source
<br />Three Phase (F6150/Programma/Manta) .......
<br />540.00
<br />1,920.00
<br />6,600.00
<br />Testing Software
<br />Doble Pro -Test Software (RTS/Protest).........
<br />120.00
<br />480.00
<br />1,680.00
<br />Transformer Test Set
<br />Doble M4100 (Power Factor) .........................
<br />900.00
<br />3,200.00
<br />12,000.00
<br />Transformer Turns Ratio Test Set (30)
<br />TTR300...........................................................
<br />200.00
<br />800.00
<br />1,980.00
<br />Winding Resistance Test Set
<br />Raytech, Vanguard .........................................
<br />240.00
<br />720.00
<br />2,160.00
<br />Recording Equipment
<br />Load Recorder
<br />ELOG, DM -III (Volts, Amps, kW, PF) .........
<br />360.00
<br />1,000.00
<br />2,500.00
<br />Power Disturbance Recorder, PQ Meter
<br />PS4500, PX5(PQ)..........................................
<br />800.00
<br />2,400.00
<br />5,500.00
<br />Medium Voltage Cable Testing Equipment
<br />Cable Location
<br />Metro -Tech .....................................................
<br />720.00
<br />2,160.00
<br />7,200.00
<br />VLF Thumper
<br />High Voltage Inc .............................................
<br />800.00
<br />2,000.00
<br />6,000.00
<br />Tan -Delta
<br />TD-60..............................................................
<br />800.00
<br />3,000.00
<br />9,000.00
<br />Partial Discharge System
<br />HT-PD.............................................................
<br />1,140.00
<br />4,560.00
<br />15,600.00
<br />A.C. Hi -Potential (Low)
<br />50kV, AC, HPA-505FCI................................
<br />350.00
<br />1,200.00
<br />3,800.00
<br />A.C. Hi -Potential (High)
<br />IOOkV, AC, 6CP100/50..................................
<br />750.00
<br />1,800.00
<br />4,000.00
<br />VLF. Hi -Potential (Low)
<br />20kV, VLF, HVA-28......................................
<br />450.00
<br />1,600.00
<br />4,000.00
<br />VLF. Hi -Potential (Mid)
<br />44kV, VLF, HVA-60......................................
<br />600.00
<br />1,800.00
<br />5,760.00
<br />VLF. Hi -Potential (High)
<br />66kV, VLF, HVA-90......................................
<br />900.00
<br />3,700.00
<br />7,000.00
<br />D.C. Hi -Potential (Low)
<br />80kV DC, PTS-80...........................................
<br />180.00
<br />720.00
<br />2,400.00
<br />D.C. Hi -Potential (Mid)
<br />100KV DC, PTS-130......................................
<br />400.00
<br />1,300.00
<br />4,080.00
<br />D.C. Hi -Potential (High)
<br />200KV DC, PTS-200......................................
<br />1,000.00
<br />3,600.00
<br />8,160.00
<br />NOTES:
<br />1) Daily rate up to 8 hours use, Weekly rate up to 40 hours use, Monthly rate up to 160 hours use.
<br />2) All shipping and handling costs are added to equipment.
<br />11 P-i--t not n. ,l 1- ATTS is --li-I at
<br />r f n1 , 1 So/ A- t., 1.1- 1 chinning
<br />
|