Laserfiche WebLink
HOT/COLD - <br />HOSE BIB <br />6"W x 12"H <br />CURB (TYP.) <br />120V 15A SERVICE— <br />OUTLET. (TYP) <br />T-0" <br />EXIT 1 -3 AIR <br />DOOR COMPRESSOR <br />V-10"ROLL-UNDOGR7 I <br />I I <br />DISCONNECTS - \ <br />3CY NARROW <br />SPARE <br />WASTE <br />COMPACTOR <br />CONTAINER <br />3CY NARROW <br />SPARE <br />WASTE <br />COMPACTOR <br />CONTAINER <br />E <br />rRECYCLING <br />2'-2%" FROM <br />CENTER OF <br />CHUTE TO <br />ELEVATOR <br />w <br />E S J <br />��w <br />o <br />CD <br />�w <br />STACKED POWER <br />PACK(2) <br />3CY NARROW <br />RECYCLING <br />COMPACTOR <br />❑ <br />CONTAINER <br />ELECTRIC PALLET JACK <br />ODOR <br />CONTROL <br />ROW <br />L <br />OR <br />R <br />Rhl <br />2'-10% <br />\ I I <br />N � <br />w T-0" EXI <br />DOOR <br />CHUTE MASTER A-500 ° 18x18 SH AUTOMATIC <br />CONTROL STEEL PLATE W/ DIAMOND = J OPENING ELECTRICALLY <br />TREAD AS WALL PROTECTION COMPACTORS 1° INTERLOCKED <br />ALONG THIS WALL. CD THRU-WALL INTAKE <br />DESIGN ISSUE #1. DOOR SEE NOTE 18 <br />0 <br />BUILDING A TRASH COLLECTION ROOM CORE 1 <br />(2) SELF CLC <br />15x <br />AUTO <br />OPENING I <br />PER CBC 71 <br />ICONSULTANT : <br />AMERICAN TRASH MANAGEMENT <br />AMERICAN PM415.292.5400 RFOR IAI946080 <br />92.5410 <br />TRASH MANAGEMENT S'BROW @TRASHMANAGE.COM <br />REDUCED TO 6". <br />DESIGN ISSUE #2. <br />UPPER VESITBULE LEVELS 02-07 (TYP <br />CENTRAL POINTE <br />SANTA ANA, CA # 2019-0129 <br />SCHEMATIC DESIGN <br />JULY 20TH, 2020 <br />30" 0 CHUTE <br />CHUTE DISCHARGE - <br />DOOR, SEE NOTE 14 <br />APOLLO MODEL A500 — <br />COMPACTOR, (2) TOTAL <br />3CY NARROW <br />TOWABLE <br />M CONTAINER <br />in <br />(2) 30"0 GALVANEAL <br />CHUTE <br />1'-34" FROM <br />EDGE OF <br />CHUTE TO <br />WALL <br />�Lo <br />2 -8 11 <br />I- <br />O W <br />i - <br />N <br />FRONT VIEW <br />2'-10%" <br />SECTION A -A <br />4'-6" <br />WASTE <br />1 1:14V y11l,4[e3 <br />SECTION B-B <br />SIDE VIEW <br />V -U <br />TOP VIEW <br />18x18 SH AUTOMATIC <br />OPENING ELECTRICALLY <br />i INTERLOCKED <br />i THRU-WALL INTAKE <br />DOOR SEE NOTE 18 <br />O U <br />�o� <br />wiz <br />L O w <br />��-a- <br />0 <br />TRASH ROOM LEVEL 1 <br />84" FROM <br />EDGE OF <br />CHUTE TO <br />WALL <br />A500 COMPACTOR FRONT <br />VIEW. BIN NOT SHOWN <br />FOR CLARITY. (TYP) <br />H ROOM LEVEL 1 <br />3'-7" <br />N <br />3'-1' <br />REAR VIEW <br />3CY NARROW CONTAINER DETAILS <br />0 2 4 8 <br />SHEET NOTES: <br />RESIDENTIAL TRASH TERMINATION ROOM <br />1. TRASH COLLECTION ROOM IS PART OF 2HR FIRE -RATED TRASH CHUTE <br />SHAFT - RESTRICTED ACCESS. <br />2. FLOOR SHALL BE FINISHED WITH WATERPROOF DECK COATING. FLOOR TO <br />HAVE MINIMAL SLOPE AND FLOOR DRAIN. FLOOR LEVEL UNDER <br />COMPACTOR. <br />3. WALLS SHALL BE FINISHED WITH WASHABLE WATERPROOF SURFACE SUCH <br />AS FRP OR HIGH -GLOSS ENAMEL PAINT, 8'-0" AFF. <br />4. INSTALL WALL PROTECTION: 12"Hx6"W CONCRETE CURB AT BASE OF ALL <br />NON -CONCRETE WALLS. DO NOT INSTALL THE CURB AROUND THE <br />COMPACTORS/BISORTER OR POWER PACKS. INSTALL STEEL PLATE WITH <br />DIAMOND TREAD BACKING ALONG WALL WHERE INDICATED FOR WALL <br />PROTECTION. <br />5. 8'-0" ROLL UP DOOR AND 3FT EXIT DOOR. <br />6. ROOM SHALL BE MECHANICALLY VENTILATED WITH (1) CFM/FT PER 2016 <br />CBC. <br />7. (2) 30" 0 GRAVITY CHUTE WITH COMPACTORS FOR WASTE & RECYCLING. <br />PROVIDE 3CY NARROW FL COMPACTOR CONTAINERS FOR WASTE & 3CY <br />NARROW FL COMPACTOR CONTAINER FOR RECYCLING. CHUTES SHALL <br />TERMINATE AT 5'-9" AFF. <br />8. PP: COMPACTOR POWER PACKS SHALL BE STACKED & FLOOR -MOUNTED. (2) <br />5HP 3-PHASE, 208/230/460V. 30A DISCONNECTS60" AFF. <br />9. MCP: CHUTE MASTER CONTROL PANEL SHALL BE WALL -MOUNTED 60" AFF. <br />MUST ALLOW LOCK DOWN OF CHUTE INTAKES FOR EXCHANGING <br />CONTAINERS AND WASHING CHUTES. REQUIRES 120V 15A DEDICATED <br />SERVICE. <br />10. AC: 2HP CHUTE AIR COMPRESSOR SHALL BE FLOOR -MOUNTED. REQUIRES <br />120V 15A SERVICE OUTLETS. <br />11. OC: ODOR CONTROL UNIT SHALL BE WALL -MOUNTED 60" AFF. REQUIRES <br />120V 15A SERVICE OUTLETS. <br />12. HB: HOT AND COLD HOSE BIB SHALL BE WALL -MOUNTED 60" AFF. <br />13. PROVIDE ELECTRIC PALLET TRUCK FOR TRANSFERRING CONTAINERS. <br />40001b CAPACITY; TURNING RADIUS: 45.5". REQUIRES 120V 15A SERVICE <br />OUTLETS. <br />14. CHUTE DISCHARGE DOOR: TYPE -A, HORIZONTALLY INSULATED <br />SLIDING -STEEL DOOR, HELD OPEN BY 165' F FUSIBLE LINK. <br />15. 5HP 3PHASE, 208/230/460V FOR THE POWER PACKS REQUIRED. <br />CHUTE INTAKE VESTIBULES: <br />16. CHUTE INTAKE VESTIBULES SHALL BE 1 HR FIRE -RATED WITH 1 HR <br />FIRE -RATED DOOR; 5-0" MIN REQUIRED PER ADA STANDARDS - <br />RESIDENTIAL ACCESS. PROVIDE (2) SELF CLOSING, 15x18 BOTTOM HINGED, <br />ELECTRICALLY INTERLOCKED, AUTOMATIC OPENING INTAKE DOORS TO <br />DISPOSE TRASH AND RECYCLING INTO COMPACTORS PER CBC 713.13.1. <br />POWER TO INTAKE DOORS SUPPLIED BY MCP. SEE DETAIL 1T2.0. <br />17. CHUTE SHAFT SHALL NOT BE ERECTED UNTIL CHUTE HAS BEEN INSTALLED. <br />FOR SOUND PROOFING PURPOSES, DOUBLE STUD -WALLS ARE REQUIRED <br />ADJACENT TO OCCUPIED SPACES. INTERIOR OF SHAFT SHALL BE TAPED TO <br />PREVENT ODOROUS AIR LEAKING INTO OCCUPIED SPACES. <br />18. PROVIDE 18X18 SIDE HINGED, AUTOMATIC OPENING, ELECTRICALLY <br />INTERLOCKED THRU-WALL INTAKE DOORS THAT DISPOSE INTO <br />CONTAINERS PER CBC 713.13.1. SEE DETAILS 2/T2.0. <br />19. PROVIDE ROUND FLOOR OPENINGS AT CONCRETE FLOORS AND SQUARED <br />FLOOR OPENINGS AT WOOD -FRAME CONSTRUCTION. INSTALL FLOOR <br />SUPPORT FRAME AT EACH FLOOR PENETRATION TO SECURE CHUTE. SEE <br />DETAIL 9/T2.0 FOR ANCHORING AND MASON BRA -RED SOUND ISOLATION <br />PAD ASSEMBLY. POUR RINGS WILL VARY BASED ON THICKNESS OF FLOOR <br />SLAB AND SHALL BE PROVIDED BY MANUFACTURER. <br />GENERAL NOTES: <br />1. ANY DESIGNS OR DESIGN SOLUTIONS PRESENTED IN THIS DRAWING OR <br />SPECIFICATION, WHICH ARE DIRECT OR IMPLIED, INCLUDING NARRATIVES, <br />DRAWINGS, OR DIAGRAMS, ARE HEREBY CLARIFIED AS EXAMPLES AND <br />SHALL NOT BE CONSIDERED COMPLETE DESIGNS OR DESIGNS SUITABLE <br />FOR CONSTRUCTION. <br />2. OMISSIONS FROM DRAWINGS OR SPECIFICATIONS, OR THE INACCURATE <br />DESCRIPTION OF DETAILS OF WORK, WHICH ARE MANIFESTLY NECESSARY <br />TO CARRY OUT THE INTENT OF THE DRAWINGS AND SPECIFICATIONS, OR <br />WHICH ARE CUSTOMARILY PERFORMED, SHALL NOT RELIEVE THE <br />CONTRACTOR FROM PERFORMING SUCH OMITTED OR INACCURATELY <br />DESCRIBED DETAILS OF THE WORK. WORK SHALL BE PERFORMED AS IF <br />FULLY AND CORRECTLY SET FORTH AND DESCRIBED IN THE DRAWINGS <br />AND SPECIFICATIONS. <br />3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS <br />PRIOR TO START OF CONSTRUCTION. THE ARCHITECT SHALL BE NOTIFIED <br />IMMEDIATELY OF ALL EXISTING FIELD CONDITIONS AND ANY <br />DISCREPANCIES OR INCONSISTENCIES. <br />DESIGN ISSUES: <br />1. SINCE COMPACTOR WILL GET CLOSE TO WALL AND NO ROOM TO MOVE IT <br />AWAY,STEEL DIAMOND TREAD AS WALL PROTECTION WHERE INDICATED IN <br />LIEU OF CURB. <br />2. MOVED WALL ATTACHED TO INTAKE DOOR TOWARDS 3FT EXIT DOOR BY <br />638" IN ORDER TO MAKE ROOM FOR CHUTE FOOTINGS. <br />TRASH COLLECTION ROOM CORE 1 <br />BUILDING A <br />T-1 00 <br />