My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Stormwater Channel Fencing Upgrades Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 16 - Stormwater Channel Fencing Upgrades Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 11:57:44 AM
Creation date
8/14/2023 5:00:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO.: 22-6469 <br />STORMWATER CHANNEL FENCING UPGRADES <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />11101311 <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Construction Permit <br />1 <br />LS <br />$10,300 <br />$10,300 <br />2 <br />Project Sign <br />1 <br />LS <br />$ I� Aoo.Od <br />$ 1'o1.00.00 <br />Minnie Open Channel <br />3 <br />Remove and Dispose existing chain <br />link fence, posts, foundations and tree <br />stumps/vegetation complete. <br />700 <br />LF <br />$ 4 • 0 0 <br />$ 01. Bo 0, Q u <br />4 <br />Furnish and Install, complete, 8-Foot <br />High Securifor 4D fence and Concrete <br />Footing. <br />1,630 <br />LF <br />$ o S p • O O <br />$ a 44, 5 p 0• <br />5 <br />Furnish and Install Complete 8-Foot <br />High by 6-Foot Wide Securifor 4D <br />single swing gate. <br />6 <br />EA <br />$ ji a��,©0 <br />$ "1 r500.00 <br />6 <br />Furnish and Install sign on fence. <br />6 <br />EA <br />$ ap • p0 <br />$ 1A0.00 <br />7 <br />UPRR Flagging * <br />15 <br />DAYS <br />$1,500 <br />$22,500 <br />8 <br />UPRR Permit <br />1 <br />LS <br />$1,045 <br />$ 1+045,00 <br />Santiago Creep — (South Side) Broadway to Main St. <br />Furnish and Install Complete 8-Foot <br />9 <br />High by 6-Foot Wide Securifor 4D <br />4 <br />EA <br />$ "j 0 0. O <br />$ tp 00 • DO <br />single swing gate. <br />Furnish and Install, complete, 8-Foot <br />10 <br />High Securifor 4D fence and Concrete <br />600 <br />LF <br />$ J 1S0 •00 <br />$q d om -o0 <br />Footing. * <br />, <br />P-6 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.