My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Stormwater Channel Fencing Upgrades Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 16 - Stormwater Channel Fencing Upgrades Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 11:57:44 AM
Creation date
8/14/2023 5:00:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA REBID <br />PROPOSAL <br />PROJECT NO.: 22-6469 <br />STORMWATER CHANNEL FENCING UPGRADES <br />11 <br />Furnish and Install sign on fence. <br />4 <br />EA <br />$ I d0.00 <br />$ 4 %0, 0 �j <br />Santiago Creek Pedestrian Crossing Bridge at Broadway <br />12 <br />Furnish and Install Wrought Iron Fence <br />and Concrete Footing per Plans. <br />35 <br />LF <br />$ 300.00 <br />$ IOISOO.00 <br />13 <br />Furnish and Install 6' Wrought Iron <br />Swing Gate. <br />1 <br />EA <br />$a��0.00 <br />$ bhSDO•t)O <br />14 <br />Furnish and Install sign on fence. <br />1 <br />EA <br />$ I d0.00 <br />$ I a-0.00 <br />TOTAL BASE BID $ y 0 0, Ci to 5. 0 0 <br />ADD ALTERNATES: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Vandalism — Maintenance Period (90 <br />Calendar Days) <br />1 <br />LS <br />$15,000 <br />$15,000 <br />TOTAL ADD ALTERNATES <br />$15,000 <br />TOTAL BASE BID + ADD ALTERNATES <br />$ y 1519 U 5. 0 0 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Bid, and any, all, or none of the add-altemate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 170 working days after the commencement date stated in the Notice to <br />Proceed. The first 80 working days of which is for construction, and if awarded, the last 90 <br />working days for the vandalism -maintenance period. The contractor shall order any material <br />P-7 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.