My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 34 - Workstation and Video Monitoring Upgrades
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 34 - Workstation and Video Monitoring Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:00:55 PM
Creation date
8/15/2023 8:56:04 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
34
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Western <br />Audio Visual & Security <br />Proposed Approach <br />Our approach starts with hiring the most qualified people. Your Project Manager, Shelby Toal, is one of only two <br />in Southern California that has the prestigious PMP Certification. He is also a 20-year veteran of the Audio Visual Industry. <br />Our Lead Design Engineer, Erik Wilson, has the most proven experience with Boardroom and Training Room style projects, <br />and their correlating overflow spaces. Western AV has become very familiar and understands that each Municipality <br />project has unique needs. Erik has become recognized as the "go to" Engineer for Consultants and Suppliers in the niche <br />world of Municipality Boardroom style projects. His vast knowledge of the Broadcasting, Streaming, and Control Systems <br />are what set his skills apart. <br />In the design/build approach, our Sales Team (Rep. & Engineer) will sit down with the client to develop the clients' <br />wants and needs for each space. Once this is complete, our team develops a bill of materials and scope of work for each <br />space. This is reviewed with the client to ensure that it meets all the requirements for the project. This applies to your <br />project as well. <br />We start off all projects with a Kick-off meeting to ensure that all parties have reviewed the scope of work <br />together. The better the Scope of Work, the better the project is executed. At this meeting we will provide the client with <br />one point of contact at our company. Once a fully executed copy of a contract or a PO is delivered to WAVS, Shelby Toal <br />will be the main point of contact for the City of Santa Ana. We like to provide our client with one point of contact to <br />ensure that communication will flow at a swift pace. <br />Our team follows the steps in our System Milestone Schedule to ensure nothing is forgotten or left behind. <br />Depending on the project needs, our Project Manager will be on -site to provide daily or weekly updates on the project. <br />Once we have completed the implementation and testing, there is another critical piece which is the training. <br />Over the years we have found out that the best Training comes from the Engineer who worked with the client to design <br />the system and implement the system. It eliminates all the questions of "Why" since both parties were part of the design, <br />changes, deletions, adds, etc. <br />Personnel Staffing Plan <br />When it comes to Municipality projects, our Project Manager (PMP), Shelby Toal, will put his best men forward on <br />the job. Due to our experience and extensive resume in Municipality projects, Western A/V understands the urgency and <br />niche quality to these systems. Our Engineers & technicians truly enjoy working on Municipality projects, since we have <br />become the experts in these systems. <br />If there is a change in management on the project, Western Audio Visual would contact City of Santa Ana directly <br />to let them know. We differ from other companies in the fact that we have two Project Managers that are aware of all <br />ongoing projects. <br />Project Controls <br />Our 30 years of experience working with Cities, Counties, and Municipalities has given our company a competitive <br />edge in this niche market. Our company has found that one major key in controlling our project costs for these projects <br />starts with a well-defined scope of work. We then have our Project Manager review that well-defined scope of work with <br />the client in the kick-off meeting. <br />Our team utilizes real-time information on our server. So, if any changes are made on our Bill of Materials, <br />Schedule, Drawings, Programming, Engineering, etc, everyone can see the exact changes in real time. The Project <br />Management Software also alerts the team of these changes once they have occurred. Our warehouse manager also <br />updates the system with equipment and shipping updates, so our field supervisors have real-time status on every item in <br />the system. <br />1592 North Batavia Street, Suite 2 12707 High Bluff Drive, Suite 200 <br />Orange, CA 92867 San Diego, CA 92130 <br />Phone#: (714) 637-7272 www.wavl.com Phone#: (760) 438-1200 <br />Fax#: (714) 637-7330 Fax#: (760) 438-0066 <br />
The URL can be used to link to this page
Your browser does not support the video tag.