Western <br />Audio Visual & Security <br />Our field team utilizes TAG Software, which helps provide daily tracking of progress on all areas of the project <br />including off -site & on -site installation, drawings, and engineering. We can show you this software in an interview. <br />In regards to accurate and timely invoices, our Project Managers review and approve of all Billings before they are <br />sent out, Tuesdays or Fridays. <br />All of our real-time information systems can be demonstrated or discussed in more thorough detail during an <br />interview. <br />In -Shop Assembly and Fabrication <br />Once a technician is hired at Western A/V, the first thing they learn about is the importance of our in -shop <br />assembly process. In fact, Western A/V has a room dedicated to in -shop assembly. In this room, our technicians will build <br />and wire racks prior to coming on -site. In addition, they can load and test code before bringing the racks and equipment <br />on -site. This process is crucial and ensures that the on -site installation will go much smoother. Our technicians have a list <br />of tests to perform before they can bring a rack to the jobsite. The Lead Technician will verify that his team has performed <br />all of those tests required. <br />Our Project Managers hold monthly and private meetings with each one of our technicians. In these meetings, <br />they can be randomly tested on Western A/V's in -shop assembly process. At that time, they will also inform the Project <br />Managers of any specific areas where they hope to improve. These private monthly meetings give our Project Managers <br />insight into each Technicians' individual strengths. Based on those individual strengths, he will put them in specific <br />courses to receive accreditations & certifications in that specific field of knowledge. <br />Testing & Acceptance <br />Aside from all the good preparation needed on the front-end, one of the most critical elements will be testing. <br />Our technicians utilize a quality control checklist, to ensure that all new items of the system are working properly. The <br />Lead Technician will always verify that his team has completed each item on their checklist. In addition, our Project <br />Manager will perform multiply quality audits throughout the installation of this project. Upon final project walk through, <br />the PM (Project Manager) or PE (Project Engineer) will provide final sign off on the quality control checklist. Once the <br />installation and testing phases are complete, training will be scheduled. <br />Western A/V can provide the Quality Control Checklist & Quality Audit Form in an interview, as a means to not <br />exceed the required page limit. <br />City Responsibilities <br />The City of Santa Ana will be responsible to perform the following tasks: <br />• Any C-10 electrical work. <br />• Perform any necessary configuration changes to the City's IP network. <br />• Configure rack -mounted server and tower PC workstations. Contractor will provide configuration related to <br />integration with AV and assistance with other configurations. <br />• Provide software and necessary licensing for SCADA system to be implemented on hardware. <br />• Provide cable TV set top box and cable TV service. <br />• Scheduling the room(s) so that our technicians can perform an uninterrupted installation. <br />1592 North Batavia Street, Suite 2 12707 High Bluff Drive, Suite 200 <br />Orange, CA 92867 San Diego, CA 92130 <br />Phone#: (714) 637-7272 www.wavl.com Phone#: (760) 438-1200 <br />Fax#: (714) 637-7330 Fax#: (760) 438-0066 <br />