My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 41 - Washington Well Site Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
06/21/2022 Regular & Special HA
>
Item 41 - Washington Well Site Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2024 12:05:01 PM
Creation date
8/15/2023 8:59:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
41
Date
6/21/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />A-2020-050 <br />INSURANCE ON FILE <br />WORK MAY PROCEED <br />UNTIL t�gURANCE EXPIRE <br />CLER-�"'K p COUNCIL <br />DATE'. <br />2016 PROPOSITION I INTEGRATED REGIONAL WATER MANAGEMENT <br />DISADVANTAGED COMMUNITY INVOLVEMENT PROGRAM <br />N TECHNICAL ASSISTANCE SUB -GRANT <br />N AGREEMENT BETWEEN THE <br />Cr. <br />p SANTA ANA WATERSHED PROJECT AUTHORITY <br />AND <br />CITY OF SANTA ANA <br />This Proposition I Integrated Regional Water Management Program ("IRWMP") Disadvantaged <br />Communities Involvement ("DCI") Program Grant Funding Contract ("Contract") is made between Santa <br />Ana Watershed Project Authority ("SAWPA") and City of Santa Ana (the "Sub -Grantee"). SAWPA and <br />the Sub -Grantee may be individually referred to as "Party", and collectively referred to as the "Parties". <br />WHEREAS Section 79745 of the Water Code provides $6.3 million to the Santa Ana River Watershed <br />for the purposes o f ensuring involvement of disadvantaged communities, economically distressed areas, <br />or underrepresented communities within integrated regional water management efforts; <br />WHEREAS in June, 2017, the California Department of Water Resources ("D\VR") and SAWPA entered <br />into a Proposition 1 IRWMP DCI Program Grant Agreement ("Grant Agreement") providing that <br />SAWPA would serve as the program manager for the $6,300,000 in IRWMP grant funds to be disbursed <br />within the Santa Ana River Watershed for the DCI Program, consistent with IRWMP and California <br />Environmental Quality Act ("CEQA") requirements, and ensuring that the maximum benefit of such <br />funds are realized in the Santa Ana River Watershed; <br />WHEREAS Exhibit A ofthe Grant Agreement, the Work Plan for SAWPA's DCI Program, includes <br />technical assistance for the development of projects, plans and programs to address community needs; <br />and <br />WHEREAS consistent with the Grant Agreement between DWR and SAWPA, SAWPA intends to <br />disburse to the Sub -Grantee a portion of the $6,300,000 in IRWMP grant funds for the DCI Progrin by <br />way of this Contract with the Sub -Grantee. <br />THEREFORE, based on the foregoing incorporated recitals and in consideration of the mutual covenants <br />and conditions set forth in this Contract, the Parties hereby agree to the following: <br />SECTION L PROTECT DESCRIPTION. <br />The City of Santa Ana is seeking funds to support project planning for its Washington Avenue Well <br />project. The proposed Washington Avenue Well Project is located at the northwest comer of the <br />intersection o f East Washington Avenue and Penn Way. The property is owned by the City o f Santa Ana. <br />The proposed well would pump groundwater into the City's existing water distribution system. The water <br />produced from the well will be disinfected using sodium hypochlorite (NaOCL) before it is discharged <br />into the water distribution system. The design capacity of the well is projected to be 2,500 to 3,000 <br />gallons per minute and would be equipped with a 350 to 400 IT motor. The proposed Washington Well <br />will be drilled to a depth ofabout 1,300 feet below ground surface and be installed with mri mum of 18- <br />inch diameter casing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.